resolution
Resolutions-2025-009
Page 4 of 8
Text from the PDF text layer; check the PDF for anything that matters.A. Coralville shall design and let the Project in compliance with Chapter 26 of the Code
of Iowa.
B. The Project consists of the following: All labor, materials and equipment necessary
to construct Jasper Avenue south of the roundabout to be installed at Forevergreen Road and
north of Andersen Place.
C. Coralville will construct the entire Project, and Tiffin agrees to execute any and all
permits necessary for the Project, including all permits required by the Iowa Department of
Transportation to issue a permit for work in the Iowa Depaitinent of Transportation right-
of-
way necessary to construct the Project.
D. Except for providing permits and cooperating with all parties regarding the Project,
Tiffin shall have no responsibility for any cost of the Project.
E. While Coralville is otherwise responsible for the entire cost of the Project, Tiffin
will acquire any necessary construction easements from properties that will remain within
its boundaries but border the Project to the west, and the property to the east which is south
s boundary line. These shall be acquired by Tiffin prior to Coralville
of Coralville'
executing its conveyance to Rarick and prior to filing a dismissal in this case, Coralville'
s
and City Engineer shall such construction easements and
City Attorney prepare necessary
plats, subject to approval by City of Tiffin, which approval shall not be unreasonably
withheld. Coralville shall provide said documentsto Tiffin contemporaneously with the
execution of this Agreement.
F. parties acknowledge that Jasper Avenue will need to be paved south of
The
Coralville' boundary lines in order to connect to Andersen Place. Tiffin agrees to
s
cooperate with Coralville, including executing necessary right of way permits, to ensure
this connection is made.
G. After completion of construction of the Project, Coralville shall maintain the
Project. Maintenance includes but is not limited to mowing, maintaining the surface of the
road, and snow removal. Tiffin shall have no responsibility for any maintenance or
maintenance costs of the Project, except for any maintenance costs that are solely due to
the negligence of Tiffin or their officers, employees, or agents.
H. Any sidewalks installed as part of the Project shall be maintained by the adjacent
property owner or as provided in the ordinances of Coralville or Tiffin.
I. Coralville agrees that the lots on the west side of South Jasper Avenue may have
s and Tiffin'
access to Jasper Ave consistent with Coralville' s normal access policies.
Coralville agrees to allow lots in Tiffin which abut Jasper Avenue to have access to Jasper
Avenue, with the understanding two lots may have a shared access onto Jasper Avenue.
J. After construction of the Roundabout Project, which is governed by a separate 28E
Agreement executed the same date as this 28E Agreement, is completed and accepted,
2
Sources
- laserfiche: Resolutions-2025-009 (Resolutions-2025-009.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.