resolution

Resolutions-2023-052

Dated July 18, 2023 9 pages Ord. 2021-487, Res. 2023-052

Open the PDF

Page 7 of 9

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>Construction Permits</th> <th>Description</th> <th>Fee Amount</th> <th>Notes</th> </tr> <tr> <td>Standpipe systems</td> <td>Required for the installation, modification or removal from service of a standpipe system. Maintenance performed in accordance with this code is not considered to be a modification and does not require a permit.</td> <td>$125 per Standpipe riser</td> <td></td> </tr> <tr> <td>Temporary membrane structures and tents</td> <td>Required to erect an air-supported temporary membrane structure, a temporary stage canopy or a tent having an area in excess of 400 square feet. See exceptions</td> <td>$75/Tent</td> <td>Up to 7 days</td> </tr> <tr> <td>All other Construction Permits listed in IFC</td> <td></td> <td>$125.00</td> <td></td> </tr> <tr> <td>Failure to Secure Permit</td> <td>Beginning work, or maintain an operation without a required permit shall double the permit fee. A stop work order shall be issued until payment is received and permit issued.</td> <td>Fee is Double the Permit Fee</td> <td></td> </tr> </table>

Sources

  • laserfiche: Resolutions-2023-052 (Resolutions-2023-052.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.