resolution

Resolutions-2022-084

Dated May 1, 2022 7 pages Res. 2022-084

Open the PDF

Page 4 of 7

Text from the PDF text layer; check the PDF for anything that matters.
specify the manner in which storm water, drainage and runoff will be accommodated. The Subdivider agrees to dispose of all storm water through the approved storm water and drainageway system as set forth in the storm water management plan. The design and construction of the storm water detention basin( s) shall be in compliance with the City' s current storm water management ordinances and policies and shall be constructed on Outlot " A", Outlot " B",Outlot " C," Outlot " D," and Lot 58 as shown on the final plat. 6. The Subdivider shall provide any water, sewer, utility and drainage easements as shown on the approved final plat. 7. Any wells shall be abandoned in accordance with applicable local, state and federal laws and regulations. 8. The requirements set forth in Section 4. 08 of the Tiffin Subdivision Ordinance regarding Neighborhood Open Space Requirements have been satisfied for this Subdivision by virtue of the dedication to the City of Outlot " A" collectively, ( the Outlots"). 9. Subdivider acknowledges that a Outlot " B",Outlot " C"and Outlot " D" will be subject to a storm water detention easement. The Subdivider shall create one or more owners associations for the entire Andersen Addition subdivision. Every owner of property in Andersen Addition Subdivision will be a member of the associations. Subdivider agrees and acknowledges that Outlot " B",Outlot " C" and Outlot " D" in Andersen Addition shall be conveyed to the associations for use as a common area and storm water detention easement. The associations shall have the sole responsibility of maintaining the storm water detention easement area located on Outlot " B",Outlot " C" and Outlot " D".The City shall have no obligation for the maintenance of said storm water detention easement areas. If the associations fail to maintain the storm water detention easement areas located on Outlot " B", Outlot " C"and Outlot " D", the City may assess each lot in the Andersen Addition subdivision equally for any maintenance costs in the same manner as property taxes and without further notice. D. s Obligations. Nothing in this Agreement shall be construed to impose Subdivider' arequirement on the City to install the original public improvements at issue herein, nor shall the Subdivider be deemed to be acting as the City' s agent during the original construction and installation of the above - described improvements. The parties agree that the obligation to install the above described public improvements herein shall plans and be in accordance with the specifications by the Subdivider and subject to the approval of the City. Furthermore, the drafted obligations shall remain on the Subdivider until completion by the Subdivider and until acceptance by the City, as provided by law. E. Dedication Acceptance. Upon the completion of grading and excavation for and the wet bottom detention basin Outlot A,the stabilization of the basin, all in accordance with on City approved plans and specifications, Outlot A shall be dedicated to the City for public use and subsequent maintenance by the City,provided that Outlot A shall be in good, suitable condition as a wet bottom detention basin at the time of said dedication, and acceptable to the City. Outlot A must be dedicated to the City by April 1, 2023 and must be in good, suitable condition and acceptable to the City at the time of dedication in accordance with the terms of this Section 3E. F. Fencing. Prior to fmal plat approval the Subdivider must comply with the fencing requirements of the Tiffin Design Standards, currently found in Chapter 16. This includes, but is not

Sources

  • laserfiche: Resolutions-2022-084 (Resolutions-2022-084.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.