resolution
Resolutions-2015-022
Page 4 of 19
Text read by the vision model; check the PDF for anything that matters.Developer's sole cost. Developer further agrees that all utilities shall be installed underground.
3. Any decorative street lighting shall be approved by the City and installed at the Developer's sole cost.
4. At such time as building construction occurs on a lot, but in no event later than five (5) years from the date this agreement is recorded, the Developer shall install sidewalks in said PAD per the widths approved on the Site Plan, in accordance with the plans and specifications of the City, and subject to inspections by the City Engineer or designate, unless otherwise shown on the plan or otherwise specified in this agreement.
5. The Developer shall submit to the City, for approval by the City Engineer, a storm water management plan which will identify the drainage of this development and specify the manner in which storm water, drainage and runoff will be accommodated. The Developer agrees to dispose of all storm water through the approved storm water and drainageway system as set forth in the storm water management plan. The design and construction of the storm water sewer system and storm water detention basin, if required by the City for this development, shall be in compliance with the City's current storm water management ordinances and policies.
6. Developer acknowledges that a portion of Lot 29 is subject to a storm water detention easement. A Tiffin Heights homeowners association for the entire Tiffin Heights subdivision has been created or will be created. Every owner of property in Tiffin Heights Subdivision will be a member of the Tiffin Heights Homeowners Association. The Tiffin Heights Homeowners Association will be a homeowners association that is separate and distinct from the Condominium Owners Association for Lot 29. Outlot B in Tiffin Heights shall be conveyed to the Tiffin Heights Homeowners Association for use as a common area. The Tiffin Heights Homeowners Association shall have the sole responsibility of maintaining the storm water detention easement area located on Lot 29 and Outlot B. The City shall have no obligation for the maintenance of said storm water detention easement area. If the Tiffin Heights Homeowners Association fails to maintain the storm water detention easement area located on Lot 29 and Outlot B, the City may assess each lot in the Tiffin Heights subdivision equally for any maintenance costs in the same manner as property taxes and without further notice.
7. The Developer shall provide water, sewer, utility and drainage easements as shown on the approved Site Plan which are acceptable to the City.
8. Developer will execute an adequate Public Access and Fire Apparatus Easement Agreement, and such other utility easement agreements all to the satisfaction of the City of Tiffin. Developer grants to the City an easement for access for any City Official acting in the course of his or her official duties.
Sources
- laserfiche: Resolutions-2015-022 (Resolutions-2015- 022.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.