Text read by the vision model; check the PDF for anything that matters.designate. Said inspections shall consist of inspection of the work in progress but shall not relieve or release the Developer from its responsibility to construct said improvements and facilities pursuant to the agreed upon plans and specifications. These improvements and facilities include but are not limited to public water system; sanitary sewer system; storm sewer and drainageway system; site grading; underground utilities; setting for lot and block monuments; and surveying and staking.
C. Standard Requirements. Further, the Developer agrees that:
1. All streets shown on the plat will be constructed of concrete paving with concrete curb and gutter, which will be shown on the construction plans, to be approved by the City Engineer, and will be dedicated to the City.
2. The Developer shall provide for the installation of all electric lines, street lights, gas mains, telephone lines and other utility facilities that are necessary at the Developer’s sole cost. Developer further agrees that all utilities shall be installed underground.
3. Any decorative street lighting shall be approved by the City and installed at the Developer’s sole cost.
4. At such time as building construction occurs on a lot, but in no event later than five (5) years from the date the subdivision plat is recorded, the Developer shall install sidewalks in said subdivision abutting said lots per the widths approved on the preliminary plat, in accordance with the plans and specifications of the City, and subject to inspections by the City Engineer or designate, unless otherwise shown on the plat or otherwise specified in this agreement.
5. The Developer shall submit to the City, for approval by the City Engineer, a storm water management plan which will identify the drainage of this development and specify the manner in which storm water, drainage and runoff will be accommodated. The Developer agrees to dispose of all storm water through the approved storm water and drainageway system as set forth in the storm water management plan. The design and construction of the storm water detention basin, if required by the City for this development, shall be in compliance with the City’s current storm water management ordinances and policies.
6. The Developer shall provide water, sewer, utility and drainage easements as shown on the approved final plat.
7. Any wells shall be abandoned in accordance with applicable local, state and federal laws and regulations.