Page 2 of 2
Text from the PDF text layer; check the PDF for anything that matters. 7. Short (three to four foot height) urban mix native and, or wetland plantings must be
provided for at least 25% of the pond normal water level perimeter. Plantings must
be on average at least ten feet wide. Planting mixes must be approved by the City
Engineer. Preferred locations of plantings are around the outlet devices.
F. Dry hydrant Installation
1. All wet -bottom detention facilities must have an emergency vehicle accessible dry
hydrant installed. See Figure 9. 1, and Figure 9. 2. Additional information regarding
installation is available at the Office of the City Engineer. All dry hydrant
installation sites will be approved by the Fire Chief and construction drawings will
be approved by the Fire Chief and the City Engineer.
NOW, THERFORE, BE IT RESOLVED, BY THE City Council of Tiffin, Iowa, to approve
the changes to Tiffin Design Standards Section 9. 13 Storm Water Management Facilities.
On the 8th day of August, 2012 at a regular City Council meeting Council person Ryan
introduced Resolution 2012 - 33 A RESOLUTION APPROVING CHANGES IN TIFFIN
DESIGN STANDARD SECTION 9. 13 STORM WATER MANAGEMENT FACILITIES
and made a motion for approval. The motion was seconded by Councilperson Weipert.
Ayes: Ryan, Bartels, Weipert, Ball, Upton
Nays: none
Absent: none
WHEREUPON five Council members voted for approval, Mayor Berner declared the
motion carried and approved Resolution 2012 -33 A RESOLUTION APPROVING
CHANGES IN TIFFIN DESIGN STANDARD SECTION 9. 13 STORM WATER
MANAGEMENT FACILITIES be adopted and signified his approval of the same by
affixing his signature thereto.
8th
Passed and Approved this day of August, 2012.
Signed:
Steve Berner, Mayor Attest:
Mic " ckson, City Clerk/ Administrator
Sources
- laserfiche: Resolutions-2012-33 (Resolutions-2012-33.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.