engineering report · L-1
Engineer's Report — L.1
Page 1 of 6
Text from the PDF text layer; check the PDF for anything that matters. Agenda Item : L-1
PROJECT UPDATE A Review of MSA Projects in Your Community
City of Tiffin, IA
CLIENT LIAISON:
Andrew Inhelder, PE
Office: 319.364.4773
Cell: 515.802.0906
[email protected]
DATE:
April 2, 2026
ON-GOING PROJECTS
REVERSE OSMOSIS WATER TREATMENT PLANT DESIGN – CLINT WIENEN
The media within the existing pressure filters has been replaced and tested for all (4) filters. The Clearwell
has been excavated, and the contractor is starting to place rebar for the base slab. Rough-Ins for the
underground electrical conduits have been installed within the new MCC room, and they are starting to
rough-in the RO Building. Precast walls and planks for the RO Building are scheduled to be delivered the
week of April 13th. Th erection of the precast is expected to commence upon delivery.
SYSTEMWIDE SANITARY SEWER MODEL – ERIC THOMPSON
MSA is updating the land use data, to reflect known (but not yet completed) development in the City to be
the new benchmark for existing conditions. The City is completing drawn down tests on the lift stations.
Once completed, MSA will integrate the draw down results into the sanitary model, export outputs, and
finalize the model construction.
VILLAGE DRIVE & ROBERTS FERRY ROAD SIGNAL DESIGN – CHAD WAGNER
Project is finalizing the project manual and then ready for city approvals.
PROJECT UPDATE
Page 1 of 6
Sources
- revize: L.1 (qbSs9LxUFCc343YmzNOV7epOV9o1z5.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: L-1 Engineer's Report
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.