Resolution No. 2026-022 – A Resolution Approving the Partial Release of the Escrow for 80/380 Commerce Park First Addition — I.3
Page 7 of 7
Text from the PDF text layer; check the PDF for anything that matters.LIST OF ITEMS TO BE CORRECTED OR COMPLETED
Tiffin Heights Village Drive Extension
Project Number: 13603028
Issue Date: 02/06/2026
DATE
ITEM DESCRIPTION ASSIGNED TO
APPROVED
Seeding – reseed ROW as necessary including slope
1 Developer
south of water tower with permanent grass.
2 Remove erosion control after stabilization. Developer
Remove all construction debris if present, including the
3 Developer 4/2/26
RCP pipe section east of the water tower.
Verify all service stubs are marked appropriately in the
4 Developer 4/2/26
field
5 Install all street signage
6 Install pavement markings
7 Provide electrical, gas, and street lighting. Developer
Perform and provide testing as documented in
8 Developer 4/2/26
attached.
Finish grade around utility structures (hydrants, valve
9 Developer 4/2/26
boxes, manholes, intakes, cleanouts)
10 Grading around eastern end of project and backfill. Developer 4/2/26
Touch up grading as needed around NE detention Developer
11 basin and provide as-built survey verifying basin
meets design
Install storm apron trash guards at east end of project Developer
12 4/2/26
and in detention basin
Finish construction of outlet structure in NE detention Developer
13 4/2/26
basin.
Grade water tower entrance road to meet road inside Developer
fence. Gate will be raised by City Staff as long as the
poles are high enough. Looks like there is ~12”-18” of
room left on existing poles.
14 4/2/26
Remove gravel around paved entrance to water tower
and reseed.
Provide granular surfacing per plans for entrance.
Grade hill south of water tower to provide mowable Developer
15 4/2/26
surface and reseed with permanent grass.
Grade west and east of water tower entrance drive to Developer
16 4/2/26
provide smooth mowable grade.
Remove 2 evergreen trees at east end along the Developer
17 western side of South Park Road, south of Village City 2/12/26
Drive.
Developer To be
Remove 1 dead tree abutting southern curb ramp at coordinated
18
east end of project. with City
Staff
Developer To be
Trim evergreen trees along the south side of Village
coordinated
19 drive near the eastern side. Trim in line with curb or
with City
slightly behind curb.
Staff
20 Verify intake throat openings meet SUDAS standards. Developer
Page 2 of 2
Z:\City Meetings 2\City Council Agendas and Minutes\2026 CITY COUNCIL\04 - April 2026\04-07-26 Council Meeting\I-3 - Village Drive Extension Walkthrough - CURRENT.docx
Sources
- revize: I.3 (uK0zcxsATwSGSVJpSd1nKr51gBfMDN.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: I-3 Resolution No. 2026-022 – A Resolution Approving the Partial Release of the Escrow for...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.