resolution · I-3

Resolution No. 2026-022 – A Resolution Approving the Partial Release of the Escrow for 80/380 Commerce Park First Addition — I.3

Open the PDF Searchable (OCR) PDF

Page 5 of 7

Text read by the vision model; check the PDF for anything that matters.
11) Touch up basin grading has been completed. The basin shall be monitored, until stabilized, for erosion/sediment accumulation after rainfall events. An as-built survey has been completed. The basin appears to be in substantial conformance with the design plans. The survey will be provided. 12) Apron trash guards have been installed. 13) Outlet structure construction/installation has been completed. 14) These items have been completed under supervision/cooperation with the water department. 15) This hill has been graded and has been seeded. 16) Completed 18) Coordination between the developer and the city shall take place for removal of this tree along with the two trees in Item # 17. 19) Coordination between the developer and the city shall take place for trimming of these trees in conjunction with the tree removals. 20) A number of the intakes have an opening that appears to be narrower than SUDAS standard. I will want to walk through this with the contractor to resolve and document the remedy. Should you have any questions or further comments, please contact me at our office. Sincerely, Brain Engineering, Inc. Daniel L. Schmidt, PE Vice President

Sources

Attached to agenda item: I-3 Resolution No. 2026-022 – A Resolution Approving the Partial Release of the Escrow for...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.