staff report memo · L-3

Tiffin Recreation Center Monthly Report — L.3

Open the PDF

Page 8 of 19

Text from the PDF text layer; check the PDF for anything that matters.
Construction Summary Schedule Update Scheduled March Activities: Scheduled April Activities: • Foundation backfill (95%) • Interior metal studs • PEMB Roofing (95%) (Soffit and Gutters left) • Mechanical, Electrical, Plumbing (MEP) • PEMB exterior metal panels (85%) rough in’s (in wall and overhead) • Locker Room CMU (100%) • Hanging drywall • Slab on grade (90%) • Slab on metal deck (100%) • Running Track Steel (100%) Manpower Report List of major subcontractors & number of employees onsite: Total number of employees: 23 • AAA Mechanical – 1 • Price Electric – 2 • Cedar Valley Steel – 5 • SG Construction – 8 • Merit Construction – 1 • Miron Concrete - 4 • Miron Construction Manager - 2 Delays • Weather – See Daily Log Weather Report ‒ 1 days in March • 3/16 – Blizzard conditions Weather Delays (Construction) Scheduled Occurred Left 12 10 2 • Materials & Labor ‒ N/A Key Issues / Concerns & Recommended Action Steps • Installation progress of exterior metal panels Deliver unmatched quality, create meaningful connections, and craft unforgettable experiences in everything we do. Capture what truly matters and find ways to inspire. Owner Progress Report | 250120 March 2026 Miron Construction Co., Inc. | 8

Sources

Attached to agenda item: L-3 Tiffin Recreation Center Monthly Report

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.