staff report memo · L-3

Tiffin Recreation Center Monthly Report — L.3

Open the PDF

Page 15 of 19

Text from the PDF text layer; check the PDF for anything that matters.
Tiffin Community Recreation Center Layout Name: 250120B Construction Schedule Update 4/03/26 Miron Construction Co., Inc. Data Date: 03-Apr-26 Page 1 of 4 250120-43PM 20260403 Activity ID Resp PredecessorsSuccessors Activity Name Orig Rem Start Finish 2026 Dur Dur Nov Apr May Jun Jul Aug Sep Oct Tiffin Community Recreation Center 254 146 28-Oct-25 A 29-Oct-26 PRECONSTRUCTION 0 0 PRECONSTRUCTION - BP1 0 0 PRECONSTRUCTION - BP2 0 0 SUBMITTALS 0 0 A/E REVIEW / APPROVAL 0 0 FAB / DELIVER 163 55 28-Oct-25 A 22-Jun-26 2350 TSF 2270 2430 Steel - Sequence 9 Mechanical Screen Fab and Deliver 117 3 28-Oct-25 A 08-Apr-26 2510 ZEPHYR 3070, 1840 Curtain Wall/Aluminum Entrance/Glazing Fab and Deliver (Field 15 5 23-Jan-26 A 10-Apr-26 2500, Verif ication Openings) 2530 ZEPHYR 2520 3070, 1840 Curtain Wall/Aluminum Entrance/Glazing Fab and Deliver (Hold 45 19 23-Jan-26 A 30-Apr-26 2500 RO Openings) 3000 MIRON DOOR 2970 3080, Wood Doors & Hardware Fab and Deliver 70 39 30-Jan-26 A 29-May-26 2920 1270 OTIS 1220 1830 Elevator - Fab and Deliver 48 48 06-Apr-26 11-Jun-26 3100 GENTRADES A1030, 2080 Casework Fab and Delivery 50 50 06-Apr-26 15-Jun-26 A1080 3210 H2I 1390 3220 Gym Equipment Field Verification 2 2 16-Apr-26 17-Apr-26 3220 H2I 3210 2910 Gym Equipment Procurement 45 45 20-Apr-26 22-Jun-26 SITEWORK 53 53 06-Jul-26 17-Sep-26 2120 SCHRADER 1830 1940 Rough Grade 5 5 06-Jul-26 10-Jul-26 1940 ALL AMERICAN 1840, 1960, Site Concrete - Curbs and Sidewalks 8 8 13-Jul-26 22-Jul-26 2120 1950 1960 SCHRADER 1940, 1870 Final Grade 5 5 23-Jul-26 29-Jul-26 1340, 1870 CULVERS 2430 1960, 1760 Landscape 10 10 30-Jul-26 12-Aug-26 1440 1950 LLPELL 1940 1760 Asphalt Overlay and Parking Lot Striping 5 5 11-Sep-26 17-Sep-26 CONSTRUCTION 192 130 08-Jan-26 A 07-Oct-26 1440 MERIT A1100, 2850, Exterior Metal Panels Building A 20 5 08-Jan-26 A 10-Apr-26 1370, 2110, 1520 PEARSON A1110, 1430, 1870, 1550, 1st Floor Interior Steel Stud Framing 13 8 30-Mar-26 A 15-Apr-26 2980, 1600, 3200 MERIT 3230 3130, 2340, 2850 Exterior Metal Panels Building C 2 1 03-Apr-26 A 06-Apr-26 3110, 1390 MIRON CONC A1110, 1450, 1970, Prep/Pour/Strip Slab on Grade - Gym Floor (Orange) 5 5 06-Apr-26 10-Apr-26 2780, 1580, 1600 PEARSON 1410, 1520, 3170, 3290, 1st Floor Drywall - Top Out and Bottom Hang 30 30 06-Apr-26 15-May-26 2340 3280, 3150 PRICEELEC 1520 1610 3290, 1st Floor In Wall Rough In - Electrical 18 18 06-Apr-26 29-Apr-26 3280, 1540 ILTENS 2850, 3260 2010, 1st Floor Overhead Rough In - Mechanical 15 15 07-Apr-26 27-Apr-26 1300, 1530 1530 AAAMECH 3230 1520, 3290, 1st Floor In Wall Rough In - Plumbing 10 10 09-Apr-26 22-Apr-26 1540 3280 2430 TSF 2850, 1960 Steel - Sequence 9 Mechanical Screens Install 15 15 09-Apr-26 29-Apr-26 2350 1580 AAAMECH 1390 1680 Gym Area Overhead Rough In - Plumbing 5 5 13-Apr-26 17-Apr-26 Actual Work Remaining Work Please review the activities for which you are responsible and the relationships to the activities of other Critical Remaining Work trades. If you have questions or comments, please contact Patrick Myers & Corey Boyles immediately. If Milestone we receive no comments from you by 5 workings days, we will assume a lack of response to be your agreement and commitment to the durations, relationships, and sequencing of this plan. As always, we will attempt to improve upon the dates shown. Periodic updates will be distributed as the project progresses.

Sources

Attached to agenda item: L-3 Tiffin Recreation Center Monthly Report

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.