contract agreement · K-2
Discussion and Consideration of Pay Application #10 – Miron Construction – Tiffin Recreation Center Project – Motion to Approve — K.2
Page 4 of 17
Text from the PDF text layer; check the PDF for anything that matters. Miron Construction Co., Inc.
CONTINUATION SHEET AIA DOCUMENT G703
Page: 3
AIA DOCUMENT G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing
Contractor's signed Certification is attached. APPLICATION NUMBER: 10
In tabulation below, amounts are stated to the nearest cent. APPLICATION DATE: 02/25/2026 INVOICE NO.:
Use Column I on Contracts where variable retainage for line items may apply. PERIOD TO: 02/28/2026 250120-0010
PROJECT NO: 250120
A 8 C D E F G H I
SCHEDULED VALUE WORK COMPLETED (D+E)
TOTAL
MATERIAL
ITEM NO. DESCRIPTION OF WORK FROM COMPLETED PER- BALANCE
CHANGE PRESENTLY RETAINAGE
ORIGINAL CURRENT PREVIOUS THIS PERIOD AND STORED %(G/c TO FINISH
ORDERS STORED
APPLICATION TO DATE
110 Metal Building Systems 1,997,300.00 24,775.83 2,022,075.83 1,727,912.96 0.00 0.00 1,727,912.96 85 294,162.87 86,395.65
115 Elevators 122,000.00 0.00 122,000.00 61,000.00 0.00 0.00 61,000.00 50 61,000.0( 3,050.00
120 Fire Suppression 204,120.00 -46,930.90 157,189.10 0.00 51,276.00 0.00 51,276.00 33 105,913.1( 2,563.80
125 Plumbing 383,200.00 -61,603.00 321,597.00 70,710.00 11,631.00 0.00 82,341.00 26 239,256.0( 4,117.05
130 HVAC 935,847.00 -215,897.00 719,950.00 274,422.00 83,776.00 0.00 358,198.00 50 361,752.0 17,909.90
135 Electrical 823,355.00 -114,490.01 708,864.99 297,817.88 8,420.00 0.00 306,237.88 43 402,627.11 15,311.89
140 Earthwork 315,386.00 11,601.70 326,987.70 285,101.44 0.00 0.00 285,101.44 87 41,886.2€ 14,255.07
145 Aggregate Piers 135,379.00 0.00 135,379.00 135,379.00 0.00 0.00 135,379.00 100 0.0( 6,768.95
150 Asphalt Paving 169,606.00 0.00 169,606.00 0.00 0.00 0.00 0.00 0 169,606.0( 0.00
155 Concrete Site Work 82,800.00 0.00 82,800.00 0.00 0.00 0.00 0.00 0 82,800.0( 0.00
160 Athletic Turf Surfacing 45,000.00 -5,500.00 39,500.00 0.00 0.00 0.00 0.00 0 39,500.0( 0.00
165 Site Utilities 64,708.00 75,782.88 140,490.88 140,490.88 0.00 0.00 140,490.88 100 0.0( 7,024.55
166 Landscaping 0.00 97,075.00 97,075.00 20,360.00 0.00 0.00 20,360.00 21 76,715.0( 1,018.00
170 Testing & Inspections Allowance 40,000.00 0.00 40,000.00 18,157.50 0.00 0.00 18,157.50 45 21,842.5( 907.88
175 New Utility Services Allowance 40,000.00 -14,543.95 25,456.05 9,395.17 0.00 0.00 9,395.17 37 16,060.8 469.76
180 Mill & Overlay N Parking Lot Allowance 101,000.00 0.00 101,000.00 0.00 0.00 0.00 0.00 0 101,000.0( 0.00
185 Flood Insurance Deductible Allowance 25,000.00 0.00 25,000.00 0.00 0.00 0.00 0.00 0 25,000.0C 0.00
190 CMU Enhancements Allowance 35,000.00 -35,000.00 0.00 0.00 0.00 0.00 0.00 0 0.0( 0.00
195 Lobby Alternate Ceiling Allowance 45,000.00 -45,000.00 0.00 0.00 0.00 0.00 0.00 0 0.0C 0.00
200 Data Cabling & Backbone Allowance 250,000.00 -250,000.00 0.00 0.00 0.00 0.00 0.00 0 o.oc 0.00
205 Access Control Allowance 34,000.00 0.00 34,000.00 0.00 0.00 0.00 0.00 0 34,000.0C 0.00
210 CCTV Allowance 45,000.00 0.00 45,000.00 0.00 0.00 0.00 0.00 0 45,000.0C 0.00
Sources
- revize: K.2 (8ML5xkHm6nq6U17AdBvw3UCIhe3sAu.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-2 Discussion and Consideration of Pay Application #10 – Miron Construction – Tiffin...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.