ordinance

Ordinances-2012-319

Open the PDF

Page 16 of 55

Text read by the vision model; check the PDF for anything that matters.
City Council shall determine. No subdivision shall be approved unless adequate drainage will be provided to an adequate drainage watercourse or facility. 5) The subdivider must document that adequate storm water detention is included in the storm sewer design. This may require work outside of the proposed subdivision's boundaries which is the sole responsibility of the subdivider. The City may require this work to be undertaken to protect surrounding properties as a condition for approval of the subdivision. 6) The storm sewers shall, upon inspection, approval and acceptance by the City, become the property of the city. However, the city may not own any detention basin or other storage facility and may require written provisions for the maintenance of the facility. Amended by 2006-279 D) Water Main System in General: 1) The subdivider shall install adequate water facilities, and fire hydrants which shall be subject to City specifications and shall be subject to review and approval by the Tiffin Fire Chief. The location of all fire hydrants shall be shown on the preliminary plat. 2) All Iowa Department of Natural Resources and any other applicable state or federal agencies permits must be secured prior to approval of the final plat. **amended by 2000-240 3) Refer to the City of Tiffin, Iowa Design Standards 4) The City's inability to generate, treat, or distribute water may be grounds for rejection of a proposed subdivision. A

Sources

  • laserfiche: Ordinances-2012-319 (Ordinances-2012-319.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.