ordinance

Ordinances-2012-313

Dated September 12, 2012 11 pages Ord. 2012-313, Ord. 313

Open the PDF

Page 4 of 11

Text read by the vision model; check the PDF for anything that matters.
contains the sizing criteria, design and specification guidelines, and BMPs that address storm water quality and quality management. 12. "Land-disturbing activity" means any activity that results in a movement of earth or a change in the existing soil cover (both vegetative and non-vegetative) or the existing topography. Land-disturbing activity includes, but is not limited to, clearing, grading, filling, excavation or addition or replacement of impervious surface. 13. "Landowner" means the legal or beneficial owner of land, including those holding the right to purchase or lease the land, or any other person holding proprietary rights in the land. 14. "Maintenance agreement" means a legally recorded document that acts as a property deed restriction; and which provides for the long-term maintenance of BMPs. 15. "Overbank flood protection volume" means providing discharge control such that the post-development 100-year storm event peak discharge does not exceed the five-year pre-development peak discharge. If channel protection, water quality, and overbank flood protection volumes share a common extended detention facility and outlet structure, water quality and channel protection volumes may be included in the overbank flood protection discharge control. 16. "Responsible person" means an individual identified in a permit issued by the City as the principal contact for communications regarding the permit. 17. "Storm water" means any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation and resulting from such precipitation. 18. "Storm water management", means the use of BMPs that are designed in accordance with the City storm water standards to reduce storm water runoff pollutant loads, discharge volumes, peak flow discharge rates, and detrimental changes in stream temperature that affect water quality and habitat. 19. "Storm Water Pollution Protection Plan" (SWPPP), means a document which describes the best management practices and activities to be implemented by a person to identify sources of pollution or contamination at a site and the actions to eliminate or reduce pollutant discharges to storm water, storm water conveyance systems, and, or receiving waters of the United States to the maximum extent practicable. 20. "Storm water wet detention pond" means a constructed storm water detention basin that has a permanent pool of water. Minimum pool depth must be ten feet for at least 25% of the permanent pool area. Upon completion of the pond, the owner must stock the pond with appropriate bass, bluegill, and catfish combination. Owner may contact IDNR fisheries for fish stocking. 21. "Water quality volume" means the storage needed to capture and treat the runoff from 90% of the average annual rainfall. For purposes of this ordinance, the design rainfall depth for determining water quality volume is 1.25 inches. Section 5: Administration. The City Administrator or designee will administer, implement, and enforce the provisions of this ordinance. Any powers granted or duties imposed upon the City may be delegated by the City to persons or entities acting in the beneficial interest of or in the employ of the City.

Sources

  • laserfiche: Ordinances-2012-313 (Ordinances-2012-313.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.