Page 1 of 11
Text from the PDF text layer; check the PDF for anything that matters. CITY OF TIFFIN ORDINANCE NO. 2012- 313 `
AN ORDINANCE REGARDING POST- CONSTRUCTION STORM WATER RUNOFF
CONTROL
BE•-IT ENACTED, BY THE CITY COUNCIL OF TIFFIN, IOWA:,
Section 1: Purpose. It is the purpose of this ordinance to:
1. Protect, maintain, and enhance the environment of the•City and the public health,
they
i'
safety, and general; welfare of public- by adopting as' the. City' s 'standards, the'-
guidelines established in the Iowa' Storm Water' Management Manual( hereinafter
referred to as the " standards") to manage the storm water runoff to improve water
quality and control the maximum rate of flow to- prevent downstream flooding; and
2. Enable the City to comply with the National Pollution Discharge Elimination
System Permit ( NPDES) and applicable statutes and regulations for storm water
runoff through the following objectives:,
A. Minimize increases in storm water runoff from development within the City
limits and fringe a"reas• in order. to reduce flooding, siltation, increases in
stream temperature, and stream' bank erosion and maintain the integrity of
p'
stream channels;
r
B. Minimize increases in nonpoint pollution caused by storm water runoff from
development which would otherwise degrade local' water quality;
C. Minimize the total annual volume of surface' water runoff which flows from any
specific development project site after completion, to not exceed the pre-.
development hydrologic regime to the, maximum extent practicable;
L.
D. Reduce storm. water runoff rates and volumes, soil erosion, and nonpoint
source pollution, whenever possible, through establishment of appropriate
minimum storm water management standards and best management practices
BMPs) and to ensure that BPMs are maintained and pose no threat to public
safety.
Section 2: Findings.
1. The United States Environmental' Agency' s ( EPA) National Pollutant Discharge
Elimination System ( NPDES) permit program administered by the Iowa
Department of Natural Resources ( IDNR) requires that' cities meeting certain
demographic and environmental criteria obtain from the IDNR ah NPDES permit
for the discharge of storm water from a Municipal Separate Storm Sewer System
MS4) Permit. The City is subject to the NPDES permit program.
2. Land development and associated increases in impervious cover alter the
hydrologic response of local watersheds and increase storm water runoff rates and
volumes, flooding, stream channel erosion, and sediment transport and
deposition; this storm water runoff contributes to increased- quantities of
waterborne pollutants; and storm water runoff, soil erosion, and nonpoint source
pollution can be controlled and minimized through the regulation of storm water
runoff from development sites.
1
Sources
- laserfiche: Ordinances-2012-313 (Ordinances-2012-313.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.