ordinance
Ordinances-2002-256
Page 21 of 24
Text read by the vision model; check the PDF for anything that matters.It must be emphasized that all of the standards specified in Paragraph 60.3(d) of the NFIP regulations must be enacted in a legally enforceable document. This includes the adoption of the effective FIRM and FIS report to which the regulations apply and the modifications made by this map revision. Some of the standards should already have been enacted by your community. Any additional requirements can be met by taking one of the following actions:
1. Amending existing regulations to incorporate any additional requirements of Paragraph 60.3(d);
2. Adopting all of the standards of Paragraph 60.3(d) into one new, comprehensive set of regulations; or
3. Showing evidence that regulations have previously been adopted that meet or exceed the minimum requirements of Paragraph 60.3(d).
Communities that fail to enact the necessary floodplain management regulations will be suspended from participation in the NFIP and subject to the prohibitions contained in Section 202(a) of the 1973 Act as amended.
A Consultation Coordination Officer (CCO) has been designated to assist your community with any difficulties you may be encountering in enacting the floodplain management regulations. The CCO will be the primary liaison between your community and FEMA. For information about your CCO, please contact:
Mr. Mr. Robert G. Bissell
Acting Director, Mitigation Division
Federal Emergency Management Agency, Region VII
2323 Grand Boulevard, Suite 900
Kansas City, MO 64108-2670
(816) 283-7002
To assist your community in maintaining the FIRM, we have enclosed a Summary of Map Actions to document previous Letter of Map Change (LOMC) actions (i.e., Letters of Map Amendment, Letters of Map Revision) that will be superseded when the revised FIRM panels referenced above become effective. Information on LOMCs is presented in the following four categories: (1) LOMCs for which results have been included on the revised FIRM panels; (2) LOMCs for which results could not be shown on the revised FIRM panels because of scale limitations or because the LOMC issued had determined that the lots or structures involved were outside the Special Flood Hazard Area as shown on the FIRM; (3) LOMCs for which results have not been included on the revised FIRM panels because the flood hazard information on which the original determinations were based are being superseded by new flood hazard information; and (4) LOMCs issued for multiple lots or structures where the determination for one or more of the lots or structures cannot be revalidated through an administrative process like the LOMCs in Category 2 above. LOMCs in Category 2 will be revalidated through a single letter that reaffirms the validity of a previously issued LOMC; the letter will be sent to your community shortly before the effective date of the revised FIRM and will become effective 1 day after the revised FIRM becomes effective. For the LOMCs listed in Category 4, we will review the data previously submitted for the LOMA or LOMR request and issue a new determination for the affected properties after the revised FIRM becomes effective.
Sources
- laserfiche: Ordinances-2002-256 (Ordinances-2002-256.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.