ordinance
Ordinances-1996-205
1996 47 pages
Ord. 1996-205, Ord. 205, Ord. 1995-197, Ord. 1994-185, Ord. 1998-218, Ord. 1996-206, Res. 1997-021
Page 17 of 47
Text read by the vision model; check the PDF for anything that matters.distribution system as it relates to both the area being platted and other areas. In such event the City will pay the subdivider the difference in cost of pipe and installation between the larger water main and the diameter of water main reasonable to meet the foreseeable needs of the area.
4) The City's inability to generate, treat, or distribute water may be grounds for rejection of a proposed subdivision. A proportional fee may be requested by the City, from the subdivider; to pay for the necessary upgrades in the water system.
5) The water supply improvements shall, upon inspection, approval, and acceptance by the City, become the property of the City.
E) Other Improvements: The owner and subdivider of the land being platted shall be responsible for the installation of sidewalks within the street area; the installation of erosion control measures, and the installation of street lighting. All such improvements shall be under the direction of the City Engineer. All improvements addressed in the City of Tiffin, Iowa Design Standards shall be constructed in compliance with the provisions of the Design Standards.
3.04. EASEMENTS REQUIRED
A) Public Utilities: The flexible placement of easements for public utilities shall be allowed, however, such placement shall be subject to the review of the Governing Body and all applicable utility companies prior to approval of the final plat. All utilities to serve each lot shall be placed in a common easement. Said easements shall
Sources
- laserfiche: Ordinances-1996-205 (Ordinances-1996-205.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.