Discussion and Consideration of Change Order #2 – Cornerstone Excavating – Tiffin Forevergreen Road Grading Project and Council Action as Needed — K.3

Open the PDF

Page 2 of 2

Text from the PDF text layer; check the PDF for anything that matters.
P. 0. Box 928 CornerStone Washington, IA 52353 (319) 653-3957 EXCAVATINGINC. Fax: (319) 653-9067 WASHINGTON, IOWA Change Request To: City of Tiffin Number: 2 Date: Job: Tiffin Forevergreen Rd Grading Job #: J0H067 Description: Erosion Control Measures Description Quantity Unit Unit Silt Fence Removal 3405 LF $0.55 $1,872.75 Hydaulic Seeding, Fertilizing, Mulching. Rural Seed Mix. Bonded Fiber Matrix Hydraulic Mulching 4 AC $4,568.00 $18,272.00 SWPPP Management, Weekly Inspections 6 Months $330.00 $1,980.00 Bulldozer to regrade site 10.0 HRS $248.00 $2,480.00 Re Install Silt Fence as-needed. 3405 LF $1.50 $5,107.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.0c $0.0c Total: $29,712.2 Bond Fees $0.0c Added Working Days Requested: Change Order Total: $29,712.25 Submitted by: BJ Miller Approved by: Cornerstone xcavating, Inc. Date:

Sources

Attached to agenda item: K-3 Discussion and Consideration of Change Order #2 – Cornerstone Excavating – Tiffin...

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.