resolution · I-2
Resolution No. 2026-035 – A Resolution Approving the Plans, Specifications, Form of Contract and Estimate of Costs for the Village Drive and Roberts Ferry Road Traffic Signal Project — I.2 (G.2)
Page 14 of 45
Text from the PDF text layer; check the PDF for anything that matters. PROPOSAL (CONT.) Project Name: Roberts Ferry Road & Village
Drive Traffic Signal Improvements
PROPOSAL: PART D – GENERAL
The Bidder hereby acknowledges that the Jurisdiction, in advertising for public bids for this project,
reserves the right to:
1. Reject any or all bids. Award of the Contract, if any, to be to the lowest responsible, responsive
Bidder; and
2. Reject any or all alternates in determining the items to be included in the Contract. Designation
of the lowest responsible, responsive Bidder to be based on comparison of the total bid plus
any selected alternates; and
3. Make such alterations in the Contract Documents or in the Proposal quantities as it determines
necessary in accordance with the Contract Documents after execution of the Contract. Such
alterations shall not be considered a waiver of any conditions of the Contract Documents, and
shall not invalidate any of the provisions thereof; and
The Bidder hereby agrees to:
1. Enter into a Contract, if this Proposal is selected, in the form approved by the Jurisdiction,
provide proof of registration with the Iowa Division of Labor in accordance with Chapter 91C
of the Iowa Code, and furnish a Performance, Payment, and Maintenance Bond; and
2. Forfeit bid security, not as a penalty but as liquidated damages, upon failure to enter into such
Contract and/or to furnish said Bond; and
3. Commence the work on this project on or before a date to be specified in a written Notice to
Proceed by the Jurisdiction; and to complete the project as described in the Notice to Bidders
and Notice of Public Hearing as noted below:
a. The Contractor shall substantially complete the project by no later than Friday,
October 2, 2026. Substantially complete shall be defined as all utility, grading, all
pole bases, conduit, underground work, wiring, cabinet installation and paving
construction completed, with the streets, and sidewalks, fully open to traffic.
Should the Contractor fail to substantially complete the work in this timeframe,
liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be
assessed for work not completed within the designated Contract term(s).
b. The Contractor shall fully complete the project within sixty (60) calendar days of the
substantial completion date. Fully complete shall be defined as all surface restoration
being completed, and all improvements being ready for final acceptance. Should the
Contractor fail to fully complete the work in this timeframe, liquidated damages of
One Thousand Dollars ($1,00.00) per calendar day will be assessed for work not
completed within the designated Contract term(s).
PROPOSAL: PART E – NON-COLLUSION AFFIDAVIT
The Bidder hereby certifies:
1. That this Proposal is not affected by, contingent on, or dependent on any other proposal submitted
for any improvement with the Jurisdiction; and
2. That no individual employed by the Bidder has employed any person to solicit or procure the work
on this project, nor will any employee of the Bidder make any payment or agreement for payment
of any compensation in connection with the procurement of this project; and
3. That no part of the bid price received by the Bidder was or will be paid to any person, corporation,
firm, association, or other organization for soliciting the bid, other than the payment of their normal
Proposal PP-2 Roberts Ferry Road & Village Drive Traffic
Signal Improvements
Sources
- revize: I.2 (G.2) (AHZDhKwEJrJMRajmBhVCtK5B1YaTRJ.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: I-2 Resolution No. 2026-035 – A Resolution Approving the Plans, Specifications, Form of...
Data last updated October 16, 2026. Built from the archive's documents; see how the data is built.