minutes

Minutes-9/22/1999

Open the PDF Searchable (OCR) PDF

Page 6 of 6

Text read by the vision model; check the PDF for anything that matters.
<table> <tr> <th>ITEM NO.</th> <th>ITEM</th> <th>UNIT</th> <th>EST QTY</th> <th>UNIT PRICE</th> <th>EXTENDED PRICE</th> <th>UNIT PRICE</th> <th>EXTENDED PRICE</th> </tr> <tr> <td>1</td> <td>Pre-Engineered Steel Truss Trail Bridge (70' x 6'); Remove and Replace; Complete</td> <td>L.S.</td> <td>1</td> <td></td> <td>$ 11,700.00</td> <td>$ 11,700.00</td> <td></td> </tr> <tr> <td>2</td> <td>Excavation, Class 20 Channel Complete</td> <td>C.Y.</td> <td>180</td> <td></td> <td>$ 18.00</td> <td>$ 3,240.00</td> <td></td> </tr> <tr> <td>3</td> <td>Structural Concrete and Reinforcing Steel; In Place</td> <td>C.Y.</td> <td>41.15</td> <td></td> <td>$ 600.00</td> <td>$ 24,690.00</td> <td></td> </tr> <tr> <td>4</td> <td>Installation of Owner Supplied Con-Span Sections; In Place</td> <td>L.S.</td> <td>1</td> <td></td> <td>$ 39,537.00</td> <td>$ 39,537.00</td> <td></td> </tr> <tr> <td>5</td> <td>Erosion Stone Material W/Engineering Fabric; In Place</td> <td>Ton</td> <td>219</td> <td></td> <td>$ 26.00</td> <td>$ 5,694.00</td> <td></td> </tr> <tr> <td>6</td> <td>Compacted Backfill (Structural Embankment); In Place</td> <td>C.Y.</td> <td>650</td> <td></td> <td>$ 8.00</td> <td>$ 5,200.00</td> <td></td> </tr> <tr> <td>7</td> <td>RA-3 Storm Sewer Intakes In Place</td> <td>EA.</td> <td>2</td> <td></td> <td>$ 1,600.00</td> <td>$ 3,200.00</td> <td></td> </tr> <tr> <td>8</td> <td>18" Dia. R.C.P. Storm Sewer Class 3; In Place</td> <td>L.F.</td> <td>87.0</td> <td></td> <td>$ 30.00</td> <td>$ 2,610.00</td> <td></td> </tr> <tr> <td>9</td> <td>18" Dia. R.C.P. Flared End Section; In Place</td> <td>EA.</td> <td>1.0</td> <td></td> <td>$ 550.00</td> <td>$ 550.00</td> <td></td> </tr> <tr> <td>10</td> <td>15" Dia. R.C.P. 45-degree Elbow Class 3; Installed</td> <td>EA.</td> <td>1</td> <td></td> <td>$ 420.00</td> <td>$ 420.00</td> <td></td> </tr> <tr> <td>11</td> <td>Remove 15" Dia. R.C.P. Storm Sewer; Complete</td> <td>L.F.</td> <td>42</td> <td></td> <td>$ 7.00</td> <td>$ 294.00</td> <td></td> </tr> <tr> <td>12</td> <td>6" Class 52 D.I.P. Water Main; In Place</td> <td>L.F.</td> <td>107.0</td> <td></td> <td>$ 42.00</td> <td>$ 4,494.00</td> <td></td> </tr> <tr> <td>13</td> <td>Remove and Reinstall Fire Hydrant and Valve; Complete</td> <td>L.S.</td> <td>1.0</td> <td></td> <td>$ 1,000.00</td> <td>$ 1,000.00</td> <td></td> </tr> <tr> <td>14</td> <td>Water Main Disinfection & Acceptance Testing; Complete</td> <td>L.S.</td> <td>1</td> <td></td> <td>$ 200.00</td> <td>$ 200.00</td> <td></td> </tr> <tr> <td>15</td> <td>7" P.C.C. Pavement; In Place</td> <td>S.Y.</td> <td>352.9</td> <td></td> <td>$ 28.00</td> <td>$ 9,881.20</td> <td></td> </tr> <tr> <td>16</td> <td>4" Thick P.C.C. Sidewalk In Place</td> <td>S.F.</td> <td>851.6</td> <td></td> <td>$ 3.00</td> <td>$ 2,554.80</td> <td></td> </tr> <tr> <td>17</td> <td>Modified RB-1 Handrail; In Place; Complete</td> <td>L.S.</td> <td>1</td> <td></td> <td>$ 3,000.00</td> <td>$ 3,000.00</td> <td></td> </tr> <tr> <td>18</td> <td>Surface Restoration (Brown Street)</td> <td></td> <td></td> <td></td> <td></td> <td></td> <td></td> </tr> <tr> <td>18A</td> <td>Seal Coat</td> <td>S.Y.</td> <td>89.0</td> <td></td> <td>$ 5.00</td> <td>$ 445.00</td> <td></td> </tr> <tr> <td>18B</td> <td>Bold Patch, Asphalt</td> <td>TON</td> <td>2.0</td> <td></td> <td>$ 100.00</td> <td>$ 200.00</td> <td></td> </tr> <tr> <td>19</td> <td>Seeding, Fertilizing and Mulching; Complete</td> <td>AC.</td> <td>0.1</td> <td></td> <td>$ 6,000.00</td> <td>$ 600.00</td> <td></td> </tr> <tr> <td>20</td> <td>Rock (Trench) Stabilization</td> <td>TON</td> <td>20.0</td> <td></td> <td>$ 24.00</td> <td>$ 480.00</td> <td></td> </tr> <tr> <td colspan="4">Base Bid Total (Items 1-20):</td> <td></td> <td></td> <td>$119,960.00</td> <td></td> </tr> </table>

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.