other · C

Discussion and Review of New Safety Surface at Woodfield Park — Item Packet

Open the PDF

Page 3 of 8

Text from the PDF text layer; check the PDF for anything that matters.
7356 Holliday Dr Kansas City, KS 66106 913-713-1573 Poured in Place Sub-base Requirements Sub-base shall be compacted aggregate, concrete, or asphalt installed in accordance with manufacturer's written specifications. A. Compacted Aggregate Base 1. 4 inches of 3/8’’, 1/2’’, or 3/4’’ clean aggregate rock, or equal, compacted to 90% of max density. 2. Compaction shall be done with a hand compactor, landscape roller, or vibratory plate compactor. 3. The base shall be installed at a slope of 2% 4. Verify that sub-surfacing drainage, if required, has been installed to provide positive drainage. B. Concrete Base 1. Thickness of 4 inches 2. 3000-3500psi 3. Use steel rebar or wire mesh for reinforcement 4. For expansion joints use 0.5'' (12mm) saw cuts every 10' (3m) 5. Slope shall be 1'' (25mm) over every 10' (3m) 6. Surface finish shall be heavy broom with a straight edge finish C. Asphalt Base 1.Thickness of 3 inches installed per manufacturer's recommendations Asphalt and Concrete base must be cured to manufacturer's recommendations before installation of safety surface Sub-base shall be approved by Owner prior to installation of the safety surface A Taylormade Company

Sources

Attached to agenda item: C Discussion and Review of New Safety Surface at Woodfield Park

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.