agenda · B
Agenda Additions/Agenda Approval — Work Session Notes
Page 1 of 1
Text from the PDF text layer; check the PDF for anything that matters.__________________________________________________________________________________
CITY OF TIFFIN
CITY ADMINISTRATOR
REPORT TO THE CITY COUNCIL – NOTES FOR WORK SESSION ITEMS
July 2, 2026
• The playground at Woodfield Park currently utilizes engineered wood fiber (wood chips)
on the playground surface. While this surface meets safety standards when properly
maintained, it requires continual maintenance, including raking, replenishing displaced
material (which often washes out) and periodic replacement to maintain appropriate fall
protection. Of all the City Parks, Woodfield’s playground surface requires the most annual
maintenance. As we have briefly discussed before, replacing this surface with a poured-in-
place rubber safety surface would reduce annual maintenance, provide consistent fall
projection, improve the look of the park and provide a longer service life than wood fiber.
However, this improvement comes with a significant investment. Attached are two options
to replace the wood fiber with the poured-in-place surface. One option has the contractor
performing all the work and the second option includes some of the work being performed
by our Public Works Department. Brian Detert will be at the work session on Tuesday
night to further discuss this with the council.
Sources
- revize: Work Session Notes (yoXHxJzQDtAQMPoIPjeUwEakoE4Xz1.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: B Agenda Additions/Agenda Approval
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.