packet
Packet: Tiffin Regular City Council Meeting (07/07/2026)
Dated July 7, 2026City Council — regular meeting, July 7, 2026 117 pages
Ord. 2026-528, Ord. 2006-277, Res. 2026-041, Res. 2026-042, Res. 2026-040
Page 79 of 117
Text read by the vision model; check the PDF for anything that matters.Estimates 2026:26176
Bill to
City of Tiffin
300 Railroad St
Tiffin, IA 52340
Ship to
Woodfield Park
Tiffin, IA 52340
Estimate details
Payment Terms: Net 30
Estimate no.: 26176 Opt 1
Estimate date: 06/03/2026
<table>
<tr>
<th>#</th>
<th>Product or service</th>
<th>Description</th>
<th>Qty</th>
<th>Rate</th>
<th>Amount</th>
</tr>
<tr>
<td>1.</td>
<td></td>
<td>Area 1</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>2.</td>
<td><b>Sub-Base</b></td>
<td>Installation of up to 6.5" of aggregate sub-base</td>
<td>1400</td>
<td>$2.39</td>
<td>$3,346.00</td>
</tr>
<tr>
<td>3.</td>
<td><b>Installation</b></td>
<td>Installation of Poured In Place Safety Surface 50/50 black & color mix for 8' and below fall height (3.5" depth)</td>
<td>1400</td>
<td>$13.93</td>
<td>$19,502.00</td>
</tr>
<tr>
<td>4.</td>
<td></td>
<td>Area 2</td>
<td></td>
<td></td>
<td></td>
</tr>
<tr>
<td>5.</td>
<td><b>Sub-Base</b></td>
<td>Installation of up to 6.5" of aggregate sub-base</td>
<td>3111</td>
<td>$2.39</td>
<td>$7,435.29</td>
</tr>
<tr>
<td>6.</td>
<td><b>Installation</b></td>
<td>Installation of Poured In Place Safety Surface 50/50 black & color mix for 8' and below fall height (3.5" depth)</td>
<td>2711</td>
<td>$13.93</td>
<td>$37,764.23</td>
</tr>
<tr>
<td>7.</td>
<td><b>Installation</b></td>
<td>Installation of Poured In Place Safety Surface 50/50 black & color mix for 9' and below fall height (4" depth)</td>
<td>400</td>
<td>$14.67</td>
<td>$5,868.00</td>
</tr>
<tr>
<td>8.</td>
<td><b>Shipping</b></td>
<td>Estimated Shipping for Material</td>
<td>4511</td>
<td>$0.68</td>
<td>$3,067.48</td>
</tr>
<tr>
<td>9.</td>
<td colspan="5">**Does not include removal of existing surface or excavation/grading of area to be 10" below desired finish***</td>
</tr>
<tr>
<td>10.</td>
<td colspan="5">***DUE TO THE VOLATILE NATURE OF THE TRANSPORTATION INDUSTRY AT THIS TIME, SHIPPING PRICES ARE ONLY VALID FOR TWO WEEKS***</td>
</tr>
</table>
Sources
- revize: Agenda packet (packet_2026-07-07_e0cdc699-e49b-4a71-81e0-5638a7ab6fb0.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 19, 2026. Built from the archive's documents; see how the data is built.