DATE: July 1, 2026
AGENDA ITEM: Discussion and Consideration of Safety Surface at Woodfield Park and
Council Action as Needed
ACTION: Motion
Work Session Discussion – Woodfield Park Playground Safety Surface
As Council may recall from previous discussions, the playground at Woodfield Park currently
utilizes engineered wood fiber (wood chips) as its safety surface. While this material meets
required safety standards when properly maintained, it requires significant ongoing
maintenance, including regular raking, replacing displaced material, and periodic
replenishment to maintain proper fall protection. Due to its location and use, Woodfield Park
requires more annual playground surface maintenance than any other City park.
Staff has explored replacing the existing wood fiber with a poured-in-place rubber safety
surface. This improvement would significantly reduce annual maintenance, provide a more
consistent and accessible safety surface, enhance the overall appearance of the playground,
and offer a longer service life. However, it also represents a considerable capital investment.
Attached are two pricing options for Council's consideration:
• Option 1: Contractor completes all preparation and installation.
• Option 2: City Public Works staff complete portions of the site preparation, reducing
the overall project cost.
This item is being presented as a discussion only. Public Works Director Brian Detert will
provide an overview of the options, anticipated maintenance savings, and answer any
questions Council may have as staff seeks direction on how to proceed.
ATTACHMENTS: Woodfield Park Estimate Options
Sources
- revize: K.4 (jyVtE1Z8WnHV3kskCbCyvWHptxZMwH.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration of Safety Surface at Woodfield Park and Council Action as Needed
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.