minutes
Minutes-2/4/2026
Page 2 of 2
Text from the PDF text layer; check the PDF for anything that matters. of-way, which was previously notpermitted, andasidewalk hassince been added onthesouth side ofthe
high school. MSA could prepare conceptual designs once MidAmerican determines whether thehigh-
pressure gaslinenear thetunnel would conflict with opening thetunnel. Following that determination,
MSA would evaluate thecost ofconstructing thewing walls andanADA-compliant trail. Six options
were presented, each offering different connection alternatives.
G. Update ontheCity ofTiffinCapital Projects
Discussion: North ParkRoad construction isscheduled tobegin inthespring. The Recreation Center
remains onschedule, with completion anticipated bytheendof2026. The Water Treatment Plant is
projected tobecompleted bytheendofSeptember 2026.
H. Update on
Discussion: The Middle School project willbegin thisspring andisscheduled forcompletion inthefall.
The Master Facilities Committee willpresent itstop25priorities totheBoard thissummer.
I. Scheduling ofNext Meeting
nd
Wednesday, September 2. Time tobedetermined later.
J. Other Business
K. Adjournment
Motion toadjourn atSchaapveld.
Second bySmith.
Allayes, meeting adjourned at6:50PM.
February 6th, 2026
Abigail Hora, City Clerk
Agenda Page 2of2
Sources
- laserfiche: Minutes-2/4/2026 (Minutes-2-4-2026.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.