contract agreement · K-4

K-4 - Rathje Change Order Explanation

Open the PDF

Page 1 of 1

Text from the PDF text layer; check the PDF for anything that matters.
February 23, 2021 Mayor and City Council. Rathje Construction is proposing the attached change order for the Original Town Urbanization Project Phase 2. As with the previous phase, the milling and asphalt stabilization work is being removed from the contract and a 12-inch Modified Subbase and Geogrid will be installed in its place. The pavement materials removed will be delivered to the quarry in Coralville where it will be crushed and recycled into other roadway products. The subbase and geogrid will provide an equivalent or superior base for the asphalt surface and curb & gutter section. Rathje is predicting an overall savings of about $10,000. However, the real benefit will be the reduction scheduling conflicts that the milling and stabilization may have caused. They are also proposing a change to the staging that was detailed in the plans. Rathje will complete the project in three stages instead of five. This will allow better utilization of their crews as well as their subcontractors’ crews. Lastly, Rathje would like to change the completion date to December 15, 2021. Some seeding/mulching work may remain into the spring of 2022, but it should be fairly minimal. I support Rathje’s efforts to re-organize the work and complete the project this year. Thanks, Benjamin A. Carhoff, P.E. Hart-Frederick Consultants PC 510 State Street, PO Box 560 Tiffin, IA 52340-0560 P. 319-545-7215 F.319-545-7220 C.319-631-1081 [email protected]

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.