bid award · M-8

M-8 - Asphalt around Fire Department Proposal

Open the PDF Searchable (OCR) PDF

Page 1 of 1

Text read by the vision model; check the PDF for anything that matters.
PROPOSAL City of Tiffin Attn: Doug Boldt 300 Railroad Street Tiffin, IA 52340 WE PROPOSE TO DO THE FOLLOWING WORK AND/OR FURNISH THE MATERIALS AT THE UNIT PRICE QUOTED BELOW: Project Fire Dept April 22, 2021 The L.L. Pelling Company proposes to do the following: On the west side of the building we will remove 11" of existing subbase and surface material and replace with 6" of new subbase stone and compact. We will place 3" of hot mix asphalt base material and compact, a tack coat and 2" of hot mix asphalt surface material and compact and roll smooth. Approximately 245 square yards. On the north side we will grade and place 5" of hot mix asphalt material. 18' wide for the length of the building. Approximately 150 square yards. <table> <tr> <th>ITEM</th> <th>DESCRIPTION</th> <th>QUANTITY</th> <th>UNIT</th> <th>UNIT PRICE</th> <th>AMOUNT</th> </tr> <tr> <td></td> <td>Removals</td> <td>245.000</td> <td>SY</td> <td>$20.05</td> <td>$4,912.25</td> </tr> <tr> <td></td> <td>Subbase Stone</td> <td>81.000</td> <td>TON</td> <td>$30.55</td> <td>$2,474.55</td> </tr> <tr> <td></td> <td>5" HMA</td> <td>245.000</td> <td>SY</td> <td>$34.60</td> <td>$8,477.00</td> </tr> <tr> <td></td> <td>Grading</td> <td>150.000</td> <td>SY</td> <td>$20.05</td> <td>$3,007.50</td> </tr> <tr> <td></td> <td>5" HMA</td> <td>150.000</td> <td>SY</td> <td>$34.60</td> <td>$5,190.00</td> </tr> <tr> <td colspan="5">Bid Total:</td> <td>$24,061.30</td> </tr> </table> Notes: 1 Final measurement will prevail. Authorized Signature [Signature] Note: This proposal may be withdrawn if not accepted within 30 days. All work & materials will be according to specifications submitted or per standard practices. Any alteration or deviation from the above specifications involving extra cost will become an extra charge over and above the estimate. Items bid per Unit of Measure are based on estimated quantities, and payment will be based on actual quantities placed. Payment is due upon receipt of invoice. 1 3/4% Service Fee will be charged on all past due accounts (21% per annum). Any expense incurred to collect past due accounts, including attorney fees, will be reimbursed by owner. Acceptance of Proposal The above prices, specifications and conditions are satisfactory and hereby accepted. You are authorized to do the work as specified. Payment will be due upon receipt of invoice. I will retain the white copy for my records and return the yellow copy for authorization to schedule work. Signature_________________________ Date______________ Signature_________________________ Date______________

Sources

  • sharepoint (M-8 - Asphalt around Fire Department Proposal.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.