packet

Packet: Tiffin Regular City Council Meeting (09/01/2026)

Open the PDF Searchable PDF tesseract layer

Page 178 of 184

Text from the PDF text layer; check the PDF for anything that matters.
City of Tiffin August 28, 2026 PROJECT UPDATE NORTH PARK ROAD IMPROVEMENTS – JAMES WATTERS Work on the sanitary service for the property on the Southwest corner of North Park Road and Mopar Drive has been completed and a change order has been processed. The Oak Hill Elementary entrance was completed Friday, August 21st and was opened to public traffic the following Monday morning for the start of the school year. Roadway paving on both northbound and southbound lanes has been completed with hand-pours for intersections, median, driveway, and tie-in paving remaining. Paving of sidewalk and trail is set to begin in late August or early September. Given the amount of anticipated traffic on North Park Road, is not expected that the roadway can be safely opened to the public until construction activities causing traffic disruption can be minimized. ROBERTS FERRY ROAD SHOULDER WIDENING – ANDREW INHELDER MSA has surveyed the area and have begun preliminary design to widen the shoulder. We will present the plans and opinion of cost to the City in September. US 6 AND DEER VIEW AVE TRAFFIC SIGNAL DESIGN – JAMES WATTERS The City is upgrading the temporary traffic signals at US 6 and Deer View Avenue to permanent signals. The survey was delayed to allow topo collection for this intersection and the North Park Road intersection at the same time. Survey work for both intersections has now been scheduled and will be completed shortly. A kickoff meeting with the City will be held after the survey is completed. Traffic turning movement counts are planned for September and October and will likely be used to support the design of the proposed improvements. Trail and stormwater improvements are also anticipated as part of the overall design effort in this area. PROJECT UPDATE Page 2 of 5

Sheets in this document

  • p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 24 Weatherstripping - Jamb Weatherstripping
  • p. 25 Certifications: *Unnotched & Notched profiles available
  • p. 26 Thresholds - Saddle
  • p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 45 10A100 · Safety Plan · MSA · Overall Facility
  • p. 46 10A101 · Life Safety Plan · MSA
  • p. 47 Floor Limits (Graphical · MSA
  • p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
  • p. 49 Plan Review Comm · MSA · Proposed
  • p. 50 Typical Architectural Details · MSA
  • p. 51 Typical Details and Schedule Architectural Schedules · MSA
  • p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 53 99H601 · HVAC Schedules · MSA
  • p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
  • p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
  • p. 57 Typical Structural Details · MSA
  • p. 58 MSA
  • p. 62 Power Plan · MSA
  • p. 77 EJ1A · Roof Trusses Layout
  • p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
  • p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
  • p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
  • p. 82 MT20 · Notes
  • p. 160 Exhibit A: Project Location

Sources

  • revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 21, 2026. Built from the archive's documents; see how the data is built.