packet

Packet: Tiffin Regular City Council Meeting (09/01/2026)

Open the PDF Searchable PDF tesseract layer

Page 177 of 184

Text from the PDF text layer; check the PDF for anything that matters.
PROJECT UPDATE  A Review of MSA Projects in Your Community City of Tiffin, IA CLIENT LIAISON: Andrew Inhelder, PE Office: 319.364.4773 Cell: 515.802.0906 [email protected] DATE: August 28, 2026 ON-GOING PROJECTS REVERSE OSMOSIS WATER TREATMENT PLANT DESIGN – CLINT WIENEN The RO skids have been delivered and assembled. Masonry walls within the RO building have been completed and painted will be completed within the next couple of weeks. Driveway paving has been partially completed. The Clearwell has been properly cleaned, disinfected, and tested for leaks. Work to be completed in the next month includes metal siding and roofing, truss installation on the addition to the existing treatment building, mezzanine construction, and ongoing electrical, plumbing, and HVAC items. At the construction meeting held on 8/25/2026, Tricon Construction is not anticipating the RO System to be operational until mid to late November. Substantial Completion was identified as 9/30/2026 in the Agreement. VILLAGE DRIVE & ROBERTS FERRY ROAD SIGNAL DESIGN – ANDREW INHELDER Project was awarded to Neumiller Electric, Inc on May 19th, 2026. Contractor and MSA are working through shop drawing submittal and review. The contractor has tentatively planned to begin construction in September. A pre-construction meeting will be scheduled closer to the anticipated project start date. Substantial Completion date for the project is October 2, 2026. HIGHWAY 6 CONCEPT AND COST ESTIMATE – JAMES WATTERS Final plans for letting were submitted to the DOT on August 4, 2026.The project will open bids for project in mid-October The DOT is currently working on the construction agreement with the City and will be submitting to the City for signature when ready. This agreement will put in place construct cost splits between the City and DOT. PROJECT UPDATE Page 1 of 5

Sheets in this document

  • p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 24 Weatherstripping - Jamb Weatherstripping
  • p. 25 Certifications: *Unnotched & Notched profiles available
  • p. 26 Thresholds - Saddle
  • p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 45 10A100 · Safety Plan · MSA · Overall Facility
  • p. 46 10A101 · Life Safety Plan · MSA
  • p. 47 Floor Limits (Graphical · MSA
  • p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
  • p. 49 Plan Review Comm · MSA · Proposed
  • p. 50 Typical Architectural Details · MSA
  • p. 51 Typical Details and Schedule Architectural Schedules · MSA
  • p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 53 99H601 · HVAC Schedules · MSA
  • p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
  • p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
  • p. 57 Typical Structural Details · MSA
  • p. 58 MSA
  • p. 62 Power Plan · MSA
  • p. 77 EJ1A · Roof Trusses Layout
  • p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
  • p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
  • p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
  • p. 82 MT20 · Notes
  • p. 160 Exhibit A: Project Location

Sources

  • revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 21, 2026. Built from the archive's documents; see how the data is built.