packet

Packet: Tiffin Regular City Council Meeting (09/01/2026)

Open the PDF Searchable PDF tesseract layer

Page 175 of 184

Text read by the vision model; check the PDF for anything that matters.
Kylee Stock 601 Gentry Ln 01-01001601-02 <table> <tr> <th></th> <th>WATER</th> <th>Water Average</th> <th>W Refund</th> <th>SEWER</th> <th>Sewer Average</th> <th>S Refund</th> </tr> <tr> <td>9/1/2026</td> <td>$ 660.19</td> <td>$ 69.26</td> <td>$ 590.93</td> <td>$ 409.90</td> <td>$ 65.17</td> <td>$ 344.73</td> </tr> <tr> <td>8/1/2026</td> <td>$ 130.93</td> <td>$ 69.26</td> <td>$ 61.67</td> <td>$ 113.61</td> <td>$ 65.17</td> <td>$ 48.44</td> </tr> <tr> <td>7/1/2026</td> <td>$ 96.36</td> <td></td> <td></td> <td>$ 88.31</td> <td></td> <td></td> </tr> <tr> <td>6/1/2026</td> <td>$ 75.61</td> <td></td> <td></td> <td>$ 69.57</td> <td></td> <td></td> </tr> <tr> <td>5/1/2026</td> <td>$ 75.95</td> <td></td> <td></td> <td>$ 69.85</td> <td></td> <td></td> </tr> <tr> <td>4/1/2026</td> <td>$ 60.94</td> <td></td> <td></td> <td>$ 57.45</td> <td></td> <td></td> </tr> <tr> <td>3/1/2026</td> <td>$ 73.48</td> <td></td> <td></td> <td>$ 67.81</td> <td></td> <td></td> </tr> <tr> <td>2/1/2026</td> <td>$ 68.53</td> <td></td> <td></td> <td>$ 63.72</td> <td></td> <td></td> </tr> <tr> <td>1/1/2026</td> <td>$ 59.68</td> <td></td> <td></td> <td>$ 56.41</td> <td></td> <td></td> </tr> <tr> <td>12/1/2025</td> <td>$ 67.84</td> <td></td> <td></td> <td>$ 63.15</td> <td></td> <td></td> </tr> <tr> <td>11/1/2025</td> <td>$ 59.68</td> <td></td> <td></td> <td>$ 56.41</td> <td></td> <td></td> </tr> <tr> <td>10/1/2025</td> <td>$ 65.60</td> <td></td> <td></td> <td>$ 61.30</td> <td></td> <td></td> </tr> <tr> <td>9/1/2025</td> <td>$ 67.90</td> <td></td> <td></td> <td>$ 63.20</td> <td></td> <td></td> </tr> <tr> <td>8/1/2025</td> <td>$ 59.58</td> <td></td> <td></td> <td>$ 64.91</td> <td></td> <td></td> </tr> <tr> <td></td> <td>$ 831.15</td> <td>Total 12 mo.</td> <td></td> <td>$ 782.09</td> <td>Total 12 mo.</td> <td></td> </tr> <tr> <td></td> <td>$ 69.26</td> <td>Average</td> <td></td> <td>$ 65.17</td> <td>Average</td> <td></td> </tr> </table> Water Refund $ 652.60 MAX $250 Sewer Refund $ 393.17 MAX-$250 FORGIVENESS GRAND TOTAL: $ 1,045.77 MAX $500

Sheets in this document

  • p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 24 Weatherstripping - Jamb Weatherstripping
  • p. 25 Certifications: *Unnotched & Notched profiles available
  • p. 26 Thresholds - Saddle
  • p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 45 10A100 · Safety Plan · MSA · Overall Facility
  • p. 46 10A101 · Life Safety Plan · MSA
  • p. 47 Floor Limits (Graphical · MSA
  • p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
  • p. 49 Plan Review Comm · MSA · Proposed
  • p. 50 Typical Architectural Details · MSA
  • p. 51 Typical Details and Schedule Architectural Schedules · MSA
  • p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 53 99H601 · HVAC Schedules · MSA
  • p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
  • p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
  • p. 57 Typical Structural Details · MSA
  • p. 58 MSA
  • p. 62 Power Plan · MSA
  • p. 77 EJ1A · Roof Trusses Layout
  • p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
  • p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
  • p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
  • p. 82 MT20 · Notes
  • p. 160 Exhibit A: Project Location

Sources

  • revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 21, 2026. Built from the archive's documents; see how the data is built.