packet

Packet: Tiffin Regular City Council Meeting (09/01/2026)

Open the PDF Searchable PDF tesseract layer

Page 174 of 184

Text read by the vision model; check the PDF for anything that matters.
Account Number: 01-01001601-02 Account Status: Active Bill Period: 7/15/2026 - 8/15/2026 Bill Date: 8/15/2026 Number of Days: 31 Projected Bill Amount: $1,400.97 Service Detail <table> <tr> <th>Service</th> <th>Rate Code</th> <th>Previous</th> <th>Current</th> <th>Consumption</th> <th>Projected Bill Amount</th> </tr> <tr> <td>100 - WATER</td> <td>WA RES MAIN - WA RES MAIN</td> <td>68,760</td> <td>76,979</td> <td>82,190</td> <td>699.80</td> </tr> <tr> <td>400 - SEWER</td> <td>SW RES MAIN - SW RES MAIN</td> <td></td> <td></td> <td></td> <td>409.90</td> </tr> <tr> <td colspan="5">GB 65 - GB 65 GAL</td> <td>13.56</td> </tr> <tr> <td colspan="6"></td> <td>$1,131.70</td> </tr> </table> Calculate Projected Bill Billing Profile <table> <tr> <th></th> <th></th> </tr> <tr> <td>Services Billed</td> <td>$1,131.70</td> </tr> <tr> <td>Contracts Billed</td> <td>$0.00</td> </tr> <tr> <td>Deposits Billed</td> <td>$0.00</td> </tr> <tr> <td>Deposits Returned</td> <td>$0.00</td> </tr> <tr> <td>Deposit Adjustments</td> <td>$0.00</td> </tr> <tr> <td>Energy Assistance</td> <td>$0.00</td> </tr> <tr> <td>Energy Assistance Returned</td> <td>$0.00</td> </tr> <tr> <td>Total Bill</td> <td>$1,131.70</td> </tr> <tr> <td>Arrears</td> <td>$269.27</td> </tr> <tr> <td>Total Projected Bill Amount</td> <td>$1,400.97</td> </tr> </table>

Sheets in this document

  • p. 21 10A102 · Proposed Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 24 Weatherstripping - Jamb Weatherstripping
  • p. 25 Certifications: *Unnotched & Notched profiles available
  • p. 26 Thresholds - Saddle
  • p. 35 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 36 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 45 10A100 · Safety Plan · MSA · Overall Facility
  • p. 46 10A101 · Life Safety Plan · MSA
  • p. 47 Floor Limits (Graphical · MSA
  • p. 48 20A101 · Architectural Floor Plan · MSA · 2 Painted Pipe Bollard
  • p. 49 Plan Review Comm · MSA · Proposed
  • p. 50 Typical Architectural Details · MSA
  • p. 51 Typical Details and Schedule Architectural Schedules · MSA
  • p. 52 20H101 · RO Building HVAC Plan · MSA · Water Treatment Facility Upgrade
  • p. 53 99H601 · HVAC Schedules · MSA
  • p. 54 20P102 · Proposed Plumbing Above Grade Floor Plan · MSA · Water Treatment Facility Upgrade
  • p. 55 20S101 · Foundation Plan · MSA · Water Treatment Facility Upgrade
  • p. 56 L-1 · Lintel Schedule · MSA · Mezzanine Framing
  • p. 57 Typical Structural Details · MSA
  • p. 58 MSA
  • p. 62 Power Plan · MSA
  • p. 77 EJ1A · Roof Trusses Layout
  • p. 78 MT20 · 2 Carpenters for 1 hrs each to layout, cut
  • p. 79 MT20 · 2 Carpenters for 2 hrs each to layout, cut
  • p. 80 Job Truss Truss Type Qty Ply Tiffin Water Treatment Plant / Structure 20 (chart; data on p. 78)
  • p. 82 MT20 · Notes
  • p. 160 Exhibit A: Project Location

Sources

  • revize: Agenda packet (packet_2026-09-01_3ad1ee37-4af1-4a67-8983-cc30e19b0f9e.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 21, 2026. Built from the archive's documents; see how the data is built.