plat site plan
WS - D - Well #5 Proposed Sites and Evaluations
Page 4 of 6
Text read by the vision model; check the PDF for anything that matters.TIFFIN, IOWA
SILURIAN WELL 5
SITE EVALUATION
Site 1: Existing Water Treatment Facility
• Advantages
o Three phase power available
o Minimize length of water main
o City owned parcel
o Land currently undeveloped
o Does not affect existing wells
o Land application of chemicals limited
o Standby power available from WTP
• Disadvantages
o In floodplain
o Requires around 7 feet of fill around well
o Not accessible during flooding
o Low visibility to prevent vandalism
o Near outfall from WWTP
• Estimate of Cost
<table>
<tr>
<th>Description</th>
<th>Unit</th>
<th>Estimated Quantity</th>
<th>Unit Price</th>
<th>Extended Price</th>
</tr>
<tr>
<td>Test Well</td>
<td>LS</td>
<td>1</td>
<td>$100,000.00</td>
<td>$100,000.00</td>
</tr>
<tr>
<td>Production Well</td>
<td>LS</td>
<td>1</td>
<td>$220,000.00</td>
<td>$220,000.00</td>
</tr>
<tr>
<td>Water Main</td>
<td>LS</td>
<td>1</td>
<td>$92,500.00</td>
<td>$92,500.00</td>
</tr>
<tr>
<td>Electrical Service</td>
<td>LS</td>
<td>1</td>
<td>$45,000.00</td>
<td>$45,000.00</td>
</tr>
<tr>
<td>Misc. Items</td>
<td>LS</td>
<td>1</td>
<td>$66,500.00</td>
<td>$66,500.00</td>
</tr>
<tr>
<td colspan="4">Subtotal</td>
<td>$524,000.00</td>
</tr>
<tr>
<td>Contingency</td>
<td></td>
<td></td>
<td></td>
<td>$52,400.00</td>
</tr>
<tr>
<td>Engineering</td>
<td></td>
<td></td>
<td></td>
<td>$112,000.00</td>
</tr>
<tr>
<td colspan="4">Total</td>
<td>$688,400.00</td>
</tr>
</table>
Sources
- sharepoint (WS - D - Well #5 Proposed Sites and Evaluations.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.