contract agreement · K-4
K-4 - Pay Estimate 4 - Rathje - Original Town Phase Two
Page 2 of 5
Text read by OCR; check the PDF for anything that matters.pare: July 31, 2021
owner: «= CITY OF TIFFIN
FRovECT: Original Town Urbanization Project: Phase Two
PROJEGT# HFCH#2218.13123
contract Rathje Ci
Pay Perio SO DATE:
meme OTY AMOUNT. QTY AMOUNT
1 [eleAinG2 cnUBaING 357.80 3s = 55780] 8 12.271.60
Zz EXCAVATION, CLASS 10, ROADWAY AND BORROW cy 5691.12) 1,878.00 | S 16,902.00. 1,978.00 | $ 17,802.00
3 _|EXCAVATION, CLASS 10, WASTE cy 2126.50 702,00 |§ 7,722.00 1,532.00 | $16,852.00
4 [Topsoit, STRP, SALVAGE
& RESPREAO cy 985.30] 266.00 |$ 3,724.00 316.0015 4,424.00
5 ___|SupsRADE PREPARATION a SY 4553.15 3,930.00{$ 7,860.00 3,950.00 |S 7,860.00
6 _ [MODIFIED SUBBASE cy 1494.53] Fy - - Is -
7__|SHOULDER FINISH, EARTH STA 43.84] s = - 3 .
& [REMOVAL OF KNOWN PIPE CULVERTS, MISC. SIZE AND TYPE iF 1334.00] 20s.00(s 2,050.00 421.00[$ 421000
9 ___|STORM SEWER, THENCHED, 12 IN DIA. LF 296,00) 8,00 LS. 520,00 162.00 | 5 10,530.00.
10__|srorM SEWER, TRENCHED, 15 IN OIA. IF 459.00 s = 320,00 [$16,840.09
11 [srorM SEWER, TRENCHED, 18 INDIA. LF 472.00) 29.00 [$6,853.00 147,00 | $11,319.60
12 |STORM SEWER, TAENCHED, 24 IN DIA. Le £32.50) 54.00/15 4,360.00 627.00 | $ 56,430.00
33 [PIPEAPRON, RCP, 24 IN. EACH 1.99] = - 1.00 [8 _1,500,00
14 _|PIPEAPRON GUARD EACH 1,00) & ~ 1.00 | 1,350.00
5_ |SUBDRAIN, FREFORATED PLASTIC PIPE,
4 IN, DIA, 779,00 | $10,906.00 $61.00] $ 12,054.00
LF $ : «Is =
6.00|$ 1,500.00 9.0015 2,250.00
60.00 | $ 15,000.00 0.00 | $15,000.00
=_[s - - [3s 5
344,00[5 13,072.00 344.00 [§ 33,072.00
14.00 | $2,750.00 jaca] $s 3,000.90
s - a FY -
5 ~ - | ~
$ = - [Ts ~
8.00| 5. 9,400.00 s.00|$ 9400.00
100} $4,700.00 2.00|s 9,400.00
s = : i 2
$ 2 __|$ =
$ : 9.00 | $32,400.00
0.40] $ 4.00 0.50 |'s 5.00
os |S 2,531.25 2.25 |S 7,593.15
£ a > § .
: 6.553 15,525.00
0,75 2,081.25 EWA 10,406.25
> 1,30. 4,575.00
= ~_ Ts ~
£ Z Sew 4
: $ x 190 |'s 750,00|
PATCHES, FULL DEPTH FINISH, BY COUNT. $ : Sant oS *
[40. PATCHES,
FULL DEPTH FINISH, COUNT.
BY £ * ~_(s :
£ 2 2 LS. *
Lead GH EY 2 Sond :
|_43__JPAVEMERYT, PCG CLASS
©, 8 DURABILITY6 IN, THICGE 3 t Sl “
|nd APOVEMIENT, IRICK/PAVER INLAY’ £ 2 a :
426.08 288618 483.13 2,898,78
28500) 2,950,00 205,00 2,950.00.
~ 46.50 697.50
34.00 350.00 33,00 $50.00|
S 30,00 200,00
|PROMerER SLOPE SEDIMENT CONTROL DEVICE 2.2 INCH hon ton
[ReviOVE PeRIMETERISL
OPE SEDIMENT CONTROL DEVICE vended. 2 = *
TON - ~ *
TOR x a x,
18 = ¥
Ig O10 32,100.00 ,
18 ool $43,790.00 [ary 335,90 ¥
BACH 33.00) x
a BACK 21,06) ~
BACH 27,00 = 2 -
f 114,98] = 2 ~
[73 |STERL errs FOR TYPE
A SIGNS . LF 412.00] - 2 *
air POLS BACH 12.00 : : :
[eLeCraicas ancurrs: Le 240,00) “ “ “
HANDHOLES
AND JUNCTION BOXES. EACH S00 2 bon 2.
TA. 32,88 x. ca 2.
7.00 : ~
£ ~ a £ 2
Ey * ~ & -
Ey “ * & *
£ * * £ =
= * =. £ :
£ 2 aE; :
by = = £ =
5 ~ -_ [3 ~
$ 2 2S. z
$ = ~ |S >
] E i - [8 -
TOTAL OF THE BASE BED (Total of Items 1-46): 51,824,618.96 $131,427.48 5353,857,98
EES SALSA SSDS SRR So TS IPNP eT AW TTT RY A EN BO ATE ET ROTO SUES
Re IT
COL Senge and Subbase Ls Loo [§ (10,900,00)| ($10,000.00)
___ s : - Is ~
fAddhional je cy 674.96 0.00) E 29,80 | 6,298,00 629,80 | $6,298.00
Georgi s¥ 6136.00 $3.00] 81408, 3780,00 [$11,340.00 3,730,00 | $11,340.00
Subbase 12Inch cy 2070.90) $36.00 Fisvassaan| —* 1,259.50 [8 45,342,00 1,259.50 | $ 45,342.00
SY 136.00] $5.00/'.2""= "540,680.00 “3,720.00 ]$ 18,900.00 3,780,00 | $18,900.00
coz Connection of sump Hines aud roof drains EACH 3.005 685.00 $2,055.00 s = 3.00 [3S 2,055.00
CO3 Flowable Mortar for storm sewer cy 6.00 | $ 152.25 $953.50 3 = 600 [s 913.30
C04 y 1s 1.00|§ 5,283.08 $5,283.08 1.00|$ 5,283.08 1,00 |S 5,283.08
CO: 5 5 - [8 >
Cor [ [ { 30.00 A - -_ [Ss =
CO al [ l 50.00 $ : | 5 :
_ CHANGE ORDER SUB-TOTAL 387,163.08 S 90,335.58
PIES FETE eSOBE ET BET
RE WRSITU
OTT UE SER POPOL EP EE Fea NL AOD TE SDT
ROLETTP RTT TE CAST
AMOUNT EARNED TOTAL $218,590.56 s
a - 187,000.00 [ $ _101,000,00
Bein RRR B aA ee 4,300.00)! $__(24,300.00 (48,600.00)| 5_ _ (48,600.
ER SE EER ee Re
Tae Oe Sas
s a 00.00|
S_ 194,190.56 Ss 196:89.56
RUS ARON EEC Be CRT Reas Pewee ee
Sources
- sharepoint (K-4 - Pay Estimate 4 - Rathje - Original Town Phase Two.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.