staff report memo · K-5

K-5 - Expanded Parking Lot at Fire Department

Open the PDF

Page 1 of 1

Text from the PDF text layer; check the PDF for anything that matters.
AGENDA ITEM # K-5 AGENDA INFORMATION TIFFIN CITY COUNCIL COMMUNICATION DATE: August 13, 2021 AGENDA ITEM: Discussion and Consideration of Expanded Parking Area at the Fire Department and Council Action as Needed ACTION: Motion SYNOPSIS: Ben Carhoff was asked to look into the cost of adding some additional parking/driveway on the north side of the fire station. This would be an area roughly 32’x 80’. Using LL Pelling’s bid prices, this can be paved for $9,841.78. This would entail placing asphalt on the existing gravel area. It does not include grading work described in Pelling’s proposal. Attached is a drawing of the proposal. Ben says creating the additional parking will require moving the edge of the proposed driveway and changes to the proposed storm sewer on the project. These can be made, but we need to give him a commitment after Tuesday’s meeting so he has time to redesign the storm sewer, driveway and make the necessary changes to the staking before Rathje begins the street work on Main Street. BUDGET ITEM: MAYOR/COUNCIL ACTION: Motion ATTACHMENTS: Conceptual Drawing PREPARED BY: Doug Boldt DATE PREPARED: August 13, 2021

Sources

  • sharepoint (K-5 - Expanded Parking Lot at Fire Department.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.