other · K-5

K-5 - Tiffin FD Parking

Open the PDF Searchable (OCR) PDF

Page 1 of 1

Text read by the vision model; check the PDF for anything that matters.
32 x 80 / 9 = 289.44 SF @ 34.60 = 9,841.78 TO 32' X 80' PARKING AND DRIVEWAY 5" HMA ON EXISTING GRAVEL (NO GRADING) AREA TO BE PAVED BY LIPPELLING FROM PROPOSAL DATED 4/17/17 FIRE STATION BUILDING MOVE STORM SODAR WALK REGULATED EDGE OF DRIVEWAY FOR FD PARKING CURRENT PROPOSED DRIVEWAY EDGE (CONCRETE)

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.