WS - D - Sanitary Sewer Interceptor Line - New Route

Dated October 19, 2021City Council — work session, October 19, 2021 2 pages

Open the PDF Searchable (OCR) PDF

Page 2 of 2

Text read by the vision model; check the PDF for anything that matters.
elevation below Potter Creek South Crossing: approx. 693.00 elevation below RJ Drive/Potter Creek North Crossing FES: 698.91 Distance between the two (approx: 900') Distance to MHZ6 south of RJ Drive (approx: 1,087') Boring is done @ 1.00% so 10.65 feet of difference needed elevation difference between the two Potter creek Crossings: 5.91 feet