Packet: Tiffin City Council Work Session (09/15/2026)
packet
Document 281
Dated September 15, 2026City Council — work session, September 15, 2026 730 pages
Ordinance 1983-117, Ordinance 2018-437, Ordinance 2010-302, Ordinance 2012-309, Ordinance 2007-288, Ordinance 2012-313, Ordinance 2007-287, Ordinance 2018-433, Ordinance 2019-446, Ordinance 2012-319, Ordinance 69
Open the PDF (opens in a new tab) Searchable PDF (opens in a new tab)
Packet: Tiffin City Council Work Session (09/15/2026), Page 679 of 730
Text from the PDF text layer; check the PDF for anything that matters.CHAPTER 170 SUBDIVISION REGULATIONS
H. Utilities.
(1) The subdivider shall provide installation of electric
distribution lines, street gas mains, telephone lines, and other facilities
in any new subdivision as are needed, before final approval shall be
given to the final plat. The subdivider shall be responsible for making
the necessary monetary arrangements to provide for such utilities as
are needed and, in addition, shall provide for underground facilities in
residential subdivisions and commercial subdivisions with each utility
company. In providing for said utility transmission lines, the
subdivider shall make sure that adequate connections are provided to
each subdivision lot of utilities as needed.
(2) The subdivider shall also submit the proposed street lighting
placements for Council approval. Upon receiving the submission,
along with the final plat and construction plans, the Council shall
cause the same to be reviewed by the City Engineer. The City
Engineer shall determine the appropriate location for the street lights
in the subdivision. In all new subdivisions, decorative street lights
shall be selected by the subdivider, from an approved list provided by
the City. All costs in connection with the furnishing of street lighting
placements, the decorative polies, light fixtures, and related parts, in
new subdivisions, shall be the responsibility of the subdivider.
(3) The subdivider shall provide all necessary easements in the
subdivision for placement of all utilities including street lights, and
will submit to the City at the time the final subdivider’s agreements is
presented, all proposed easements for use in the subdivision.
(4) As a condition of the approval of the final plat by the City,
the preliminary and final subdivision plat shall be presented to the
designated representatives of the utility companies serving this
subdivision area for the purpose of review and concurrence that
sufficient easements have been obtained and shown on the final plat
to accommodate placement of their particular utility service lines.
(5) All proposed utility line locations in public rights-of-way or
municipal easement shall be reviewed by the City for the purpose of
avoiding location, topographic, or other conflicts. In no case shall the
permanent utility lines or appurtenances be constructed prior to
authorization and approval of the final plat by the City.
I. Underground Public Utility Facilities.
(1) It is required that in all new residential and commercial
subdivisions all on-site utility lines including, but not limited to,
electric, communications, street lighting, and gas lines shall be
installed underground except as hereinafter provided. For the purpose
of this section, appurtenances and associated equipment such as, but
not limited to, surface-mounted transformers, pedestal-mounted
terminal boxes, and meter cabinets may be place aboveground.
CODE OF ORDINANCES, TIFFIN, IOWA
- 1839 -
Sources
- City agenda center (revize): Agenda packet (packet_2026-09-15_3ae8c189-9979-4d30-987b-38d0c38bde62.pdf) — where it was found first seen Oct 12, 2026
Data last updated November 15, 2026. Built from the archive's documents; see how the data is built.