other · K-5
K-5 - Upgrades to Deerview Park - Two new BB Hoops
Page 1 of 1
Text read by the vision model; check the PDF for anything that matters.PREPARED FOR: Frank Haege
Address: Parks & Rec Director
City / State / Zip: Tiffin, IA
email: [email protected]
Deerview Park
Hoop(s) / Full Installation
Invoice # 070122
Date proposed: 2/23/2022
Outdoor Court
Width:
Length:
Phone: 612.206.4342
1. SITE PREPARATION:
___ Tree Removal
___ Leveling
___ Fine Grading
___ *Other: power washing driveway and old line removing done by customer
Fill Hauled Out
Fill Hauled In
Fence Removal (home owner)
2. CONCRETE WORK:
4" approx thickness 4,000 p.s.i. Approx 1" on 10" slope
x fibers ____________ d.c.
CONCRETE PUMP: Distance Buggy Pump Truck ____________
SUBTOTAL $300
3. COMPONENTS:
___ Painted Court lines on tile
___ Painted Court Lines on concrete
x Replace broken board at Potter
Buggy Rental
x Ball Hoop
To minimize ingress / egress ground disturbance
Goal Setter All American 60" glass, 6'-10' adjustable.
Goal Setter MVP 72" glass, 8'-10' adjustable.
(2) Rebounder System
(2) Rebounder Install
Acrylic Board
For All Americans
x Hoop install
Auger, Set Anchor, Assemble, Installation
Freight
Type:
Full Court Lines - Free throw lane, hash marks, 3 pt line
Full Court Lines - Free throw lane, hash marks, 3 pt line
To minimize ingress / egress ground disturbance
Goal Setter All American 60" glass, 6'-10' adjustable.
Goal Setter MVP 72" glass, 8'-10' adjustable.
10' x 10' vertical containment / bounce back netting
Concrete, Concrete, Installation
For All Americans
Auger, Set Anchor, Assemble, Installation
Price:
$919
$2,350 ea Acrylic Board $4,700
$600 each $1,200
Component/Surface Total $6,819 $0
4. Extra's - charges may apply if required.
Black dirt around court.
x Disassemble Hoop / Remove Anchor / Haul away. $300 / hoop
Mileage, Hotel, Per Diem - 38 miles @ $.45/mile, 3 trips
Hoop installation hardware if needed
Epoxy / Concrete needed for Volleyball pole installation
In Iowa, Dial 811: Utility locates will need to be done before digging. Could alter costs if issues.
Customer Signature __________________________ Date ________________
Courts Fore Sports __________________________ Date ________________
Terms - Due 7/15/22
Deposit: $0
No Credit Cards please.
Due: $7,969
Thank you for the opportunity - we appreciate your business!!
Option 1
Most Popular
60" x 38" glass
6'-10' adjustable
break away rim
5"x5" offset pole
All American
Acrylic
Qty 2
Hoops Only
$300
Option 2
Option 3
SUBTOTAL $7,719 $0
Freight $250 $0
SUBTOTAL $7,969 $0
Tax n/a $0
TOTAL Option: $7,969 $0 $0
Courts Fore Sports
Jason Miller
4218 V Street
Homestead, IA 52236
319.531.0066
[email protected]
Sources
- sharepoint (K-5 - Upgrades to Deerview Park - Two new BB Hoops.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.