engineering report · M-6
M-6 - Engineer's Report
Page 2 of 2
Text from the PDF text layer; check the PDF for anything that matters. City of Tiffin
April 5, 2022
PROJECT UPDATE
Potable Water Quality Discussion
MSA provided guidance to Administrator Boldt and Operator Mehmen on water quality including the
differences between corrosive water and hard water. MSA also reviewed most recent testing information for
the City’s potable water system.
Wastewater Treatment Facility Chloride Compliance Schedule Discussion
After discussing with City Staff, MSA is checking with DNR representatives to verify next steps for the City to
work toward compliance with the new Chloride limits listed in its NPDES permit.
DEVELOPMENT ASSISTANCE
Planning & Zoning (P&Z)
MSA did not attend the March P&Z meeting as was determined not to be necessary based on agenda. However,
we remain available to attend meetings as required.
Madden Addition Lot 55
MSA informally reviewed concepts and participated in Overlay Planned Development (OPD) meeting for this
development with City Staff.
Park Place Part 8 Construction Document Review
MSA has reviewed construction documents from the Developer on behalf of the City. Initial comments were
provided to City Staff on Friday 2/24.
Quality Care Storage Phase 1 Addition – Lot 2 Villages of Tiffin Phase 1
MSA discussed proposed site plan and provided feedback on possible utility conflicts with Administrator Boldt.
Traffic Signalization at Highway 6 & Kimberlite Street
MSA corresponded with Administrator Boldt about the need for a Traffic Impact Analysis from the Developer
to be submitted to the DOT for review.
Attachments:
- None
Action Items:
- None
PROJECT UPDATE
Page 2 of 2
Sources
- sharepoint (M-6 - Engineer's Report.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.