resolution · H-1
Resolution No. 2026-047 A Resolution Approving the Iowa Statewide Transportation Alternatives Set-Aside Program (TA Set-Aside) Application — H-1
Page 5 of 35
Text from the PDF text layer; check the PDF for anything that matters. |1
Iowa Transportation Alternatives Set-Aside Program Application
Please review the program guidance before completing this application.
https://iowadot.gov/systems_planning/Grant-Programs/Transportation-Alternatives
PART A – PROJECT SPONSOR INFORMATION
Project Sponsor: City of Tiffin
Contact Name: Doug Boldt Contact Title: City Administrator
Email Address: [email protected]
Street Address: 300 Railroad Street, P.O. Box 259
City: Tiffin Zip Code: 52340 Phone Number: (319) 545-2572
Unique Entity Identifier (UEI): LUNRULJBBB35
(To verify existing UEI or to register, go to System for Award Management at https://SAM.gov. The entity name
associated with the UEI must match the entity listed on this application as the project sponsor.)
Metropolitan Planning Organization (MPO)
MPOJC
or Regional Planning Affiliation (RPA):
(To identify your local MPO or RPA, go to https://iowadot.gov/systems_planning/Grant-Programs/Transportation-
Alternatives )
PART B – PROJECT INFORMATION
Project Title. U.S. 6 Pedestrian Trail and Underpass
Project Description. The project description entered in the space below should include summary details of only the
project scope that is the subject of the funding request. Do not provide details of completed or future phases of a
larger project. For a construction project, the description should include the facility name, brief description of the
work to be completed, length of the project to be completed, the project end points or termini, and any existing
connecting trails or facilities.
The project is located on United States Highway 6 (U.S. 6), from Deerview Ave to Roberts Ferry Rd. The project will
include construction of a 10’ shared-use path along the 0.50 mile stretch of U.S. 6 on the north side between
Deerview Ave and Roberts Ferry Rd. An existing 12’ x 8’ precast concrete underpass will be excavated, and the
proposed trail will connect south across U.S. 6 to provide safe access to Clear Creek Amana Middle School and Clear
Creek Amana High School. A trail connection will be extended north from the underpass to connect to Redbird Run.
Ancillary work includes storm sewer around the underpass connections, underpass lighting, and turf establishment.
See Attachment B – Detailed Map.
Is this application intended to be considered for funding as a Safe Routes to School (SRTS)
project? If yes, Part E of this application form must be completed. If a SRTS construction project, ☒ Yes ☐ No
the project must be located within 2 miles of a school serving students K-12.
Is this application located immediately adjacent to a state-designated Iowa Byway?
If yes, the project should be identified in the byway’s adopted Corridor Management Plan and the ☐ Yes ☒ No
application shall include an endorsement of the project by the local byway organization.
Upon completion, will the project be open to the public? ☒ Yes ☐ No
Do you intend to charge a fee to users? If yes, how much will the fee be and how will the
revenue be used? ☐ Yes ☒ No
Sources
- revize: H-1 (qqh90ssRBjM0YMSB9978GDhkmHl9AG.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: H-1 Resolution No. 2026-047 A Resolution Approving the Iowa Statewide Transportation...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.