WS - E - Tiffin Fire Department Fee Schedule 2023
Page 6 of 8
Text from the PDF text layer; check the PDF for anything that matters.Construction Permits Description Fee Amount Notes
Required for the installation, modification or removal
from service of a standpipe system. Maintenance
Standpipe systems $125 per Standpipe riser
performed in accordance with this code is not considered
to be a modification and does not require a permit.
Required to erect an air-supported temporary membrane
Temporary membrane structures and tents structure, a temporary stage canopy or a tent having an $75/ Tent Up to 7 days
area in excess of 400 square feet. See exceptions
All other Construction Permits listed in IFC $125.00
Beginning work, or maintain an operation without a
required permit shall double the permit fee. A stop work
Failure to Secure Permit Fee is Double the Permit Fee
order shall be issued until payment is received and
permit issued.