staff report memo

WS - E - Tiffin Fire Department Fee Schedule 2023

Open the PDF

Page 6 of 8

Text from the PDF text layer; check the PDF for anything that matters.
Construction Permits Description Fee Amount Notes Required for the installation, modification or removal from service of a standpipe system. Maintenance Standpipe systems $125 per Standpipe riser performed in accordance with this code is not considered to be a modification and does not require a permit. Required to erect an air-supported temporary membrane Temporary membrane structures and tents structure, a temporary stage canopy or a tent having an $75/ Tent Up to 7 days area in excess of 400 square feet. See exceptions All other Construction Permits listed in IFC $125.00 Beginning work, or maintain an operation without a required permit shall double the permit fee. A stop work Failure to Secure Permit Fee is Double the Permit Fee order shall be issued until payment is received and permit issued.

Sources

  • sharepoint (WS - E - Tiffin Fire Department Fee Schedule 2023.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.