staff report memo

WS - E - Tiffin Fire Department Fee Schedule 2023

Open the PDF

Page 3 of 8

Text from the PDF text layer; check the PDF for anything that matters.
Operational Permits (Continued) Description Fee Amount Term Kindling or maintaining of an open flame or a fire on any Per Open Burn public street, alley, road, or other public or private Open burning $100.00 Ordinance. See ground. Instructions and stipulations of the permit shall Footnote #5 be adhered to. Exceptions are recreational fires. Required to use open flames or candles in connection Open flames and candles with assembly areas, dining areas of restaurants, or $50.00 365 Days drinking establishments. Required for any organic-coating manufacturing Organic coatings operation producing more than 1 gallon of an organic $150.00 365 Days coating in one day. Plant extraction systems Required to use plant extraction systems. $200.00 365 Days Required for use and handling of pyrotechnic special Pyrotechnic special effects material $150.00 Per Event effects material. Required for storage and handling of more than 25 Pyroxylin plastics pounds of cellulose nitrate plastics and for the assemble $100.00 365 Days or manufacture of articles involving Pyroxylin plastics. Required to operate a mechanical refrigeration unit or Refrigeration equipment $100.00 365 Days system regulated by the IFC. Repair garages and motor fuel-dispensing facilities Repair garages and motor fuel-dispensing facilities $100.00 365 Days required to conduct a spraying or dipping operation Spraying or dipping utilizing flammable or combustible liquids, or the $150.00 365 Days application of combustible powders regulated by the IFC. An operational permit is required to establish, conduct or maintain storage of scrap tires and tire byproducts Storage of scrap tires and tire byproducts $150.00 365 Days that exceeds 2,500 cubic feet of total volume of scrap tires, and for indoor storage of tires and tire byproducts. Required to operate an air-supported temporary After 7 days, up to 30 membrane structure, a temporary special event days unless allowed Temporary membrane structures and tents $75.00/ Tent structure or a tent having an area in excess of 400 square longer by another feet. See Exception in IFC. code. Required for the operation of wrecking yards, junk yards Waste handling $100.00 365 Days and waste material-handling facilities. All other Operational Permits listed in IFC $100.00 Any occupancy operating without a required permit shall Failure to Secure Permit double the permit fee. A stop work order shall be issued Fee is Double the Permit Fee until payment is received and permit issued. *Operational permits shall be submitted not less than 14 days prior to the event requiring a permit.

Sources

  • sharepoint (WS - E - Tiffin Fire Department Fee Schedule 2023.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.