staff report memo
WS - E - Tiffin Fire Department Fee Schedule 2023
Page 3 of 8
Text from the PDF text layer; check the PDF for anything that matters.Operational Permits (Continued) Description Fee Amount Term
Kindling or maintaining of an open flame or a fire on any
Per Open Burn
public street, alley, road, or other public or private
Open burning $100.00 Ordinance. See
ground. Instructions and stipulations of the permit shall
Footnote #5
be adhered to. Exceptions are recreational fires.
Required to use open flames or candles in connection
Open flames and candles with assembly areas, dining areas of restaurants, or $50.00 365 Days
drinking establishments.
Required for any organic-coating manufacturing
Organic coatings operation producing more than 1 gallon of an organic $150.00 365 Days
coating in one day.
Plant extraction systems Required to use plant extraction systems. $200.00 365 Days
Required for use and handling of pyrotechnic special
Pyrotechnic special effects material $150.00 Per Event
effects material.
Required for storage and handling of more than 25
Pyroxylin plastics pounds of cellulose nitrate plastics and for the assemble $100.00 365 Days
or manufacture of articles involving Pyroxylin plastics.
Required to operate a mechanical refrigeration unit or
Refrigeration equipment $100.00 365 Days
system regulated by the IFC.
Repair garages and motor fuel-dispensing facilities Repair garages and motor fuel-dispensing facilities $100.00 365 Days
required to conduct a spraying or dipping operation
Spraying or dipping utilizing flammable or combustible liquids, or the $150.00 365 Days
application of combustible powders regulated by the IFC.
An operational permit is required to establish, conduct
or maintain storage of scrap tires and tire byproducts
Storage of scrap tires and tire byproducts $150.00 365 Days
that exceeds 2,500 cubic feet of total volume of scrap
tires, and for indoor storage of tires and tire byproducts.
Required to operate an air-supported temporary After 7 days, up to 30
membrane structure, a temporary special event days unless allowed
Temporary membrane structures and tents $75.00/ Tent
structure or a tent having an area in excess of 400 square longer by another
feet. See Exception in IFC. code.
Required for the operation of wrecking yards, junk yards
Waste handling $100.00 365 Days
and waste material-handling facilities.
All other Operational Permits listed in IFC $100.00
Any occupancy operating without a required permit shall
Failure to Secure Permit double the permit fee. A stop work order shall be issued Fee is Double the Permit Fee
until payment is received and permit issued.
*Operational permits shall be submitted not less than 14 days prior to the event requiring a permit.
Sources
- sharepoint (WS - E - Tiffin Fire Department Fee Schedule 2023.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.