staff report memo · K-4
Discussion and Consideration to Approve a Wastewater Treatment Plant Storage Building – Motion to Approve — K-4
Page 1 of 2
Text from the PDF text layer; check the PDF for anything that matters. AGENDA ITEM # K-2
AGENDA INFORMATION
TIFFIN CITY COUNCIL COMMUNICATION
DATE: September 9, 2026
AGENDA ITEM: Discussion and Consideration of the Approval of a Wastewater Treatment
Plant Storage Building
ACTION: Motion
Background
The Water/Wastewater Department utilizes a tractor at the Wastewater Treatment Facility to
assist with the pushing and movement of sludge as part of the facility's regular operations.
The tractor is currently stored outdoors and is exposed to weather conditions and other
environmental factors. The Department has also experienced ongoing issues with mice and other
varmints getting into the tractor and causing damage. The tractor is an important piece of
operational equipment for the wastewater treatment facility. Continued outdoor storage increases
the potential for additional damage, premature deterioration, and equipment downtime.
Providing an enclosed storage location would help protect the City's investment in the equipment
and provide a more appropriate storage environment for a piece of equipment that is regularly
used in wastewater operations.
A significant benefit of this project is that the City's Public Works Department has the ability to
complete the construction of the storage building using existing City staff and equipment.
Public Works staff would be able to perform the necessary work associated with preparing the
site and constructing the building rather than the City contracting the entire project to an outside
contractor.
This provides a substantial cost savings to the City by eliminating or significantly reducing
outside contractor labor and installation costs.
The estimated $19,000–$22,000 project cost represents the anticipated cost of the building and
necessary materials, while the construction labor would be provided by City staff.
Utilizing Public Works staff also allows the City to maintain greater control over the project
schedule and construction process.
Recommendation
Staff recommends that the City Council approve the construction of an approximately 16-foot by
26-foot enclosed storage building at the Wastewater Treatment Facility for the Wastewater
Department's tractor, at an estimated material cost of $19,000–$22,000.
ATTACHMENTS: Shed Rendering
1
Sources
- revize: K-4 (UxAQrVgPGRCXeuAYJDwYOHdXsfVARP.pdf) — where it was found ↗ first seen Oct 12, 2026
Attached to agenda item: K-4 Discussion and Consideration to Approve a Wastewater Treatment Plant Storage Building...
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.