bid award · K-4

K-4 - Sanitary Sewer System Design Proposal - Hickory Knoll - MSA

Open the PDF

Page 9 of 10

Text from the PDF text layer; check the PDF for anything that matters.
3. Permits  Sewer Collection Construction Permit (Iowa DNR).  NPDES Construction General Permit No. 2 (Iowa DNR)  Permit fees to be paid by Owner. TASK 6: BIDDING SERVICES 1. Bidding  Assist Owner in Advertising and Soliciting for Bids  Administer Bid Document Distribution Process utilizing QuestCDN  Issue Addenda as appropriate to clarify, correct, or change the bidding documents  Conduct a Public Bid Opening.  Prepare Tabulation of Bids  Assist Owner in evaluating bids and in assembling and awarding construction contracts. ASSUMPTIONS  Owner shall provide access to any and all relevant structures and equipment as necessary to complete evaluation OWNER PROVIDED INFORMATION  Permitting fees.  Coordination with landowners to acquire necessary permanent & temporary easements.  Acquiring property owner permission to perform surveying services on private property. SERVICES NOT INCLUDED (THESE CAN BE EASILY PROVIDED AS AN ADDITIONAL SERVICE IF DESIRED)  Additional meetings. Attendance at any meetings that are not specially addressed in the scope above.  Construction administration/observation is assumed to be under a supplemental agreement.  Easement negotiations, fees or compensation.  Right-of-Way negotiations, fees or compensation.  Permit application fees.  Construction staking.  Computer 3D visualizations or renderings.  Owner changes to the plans and specifications after Owner approval has been given.  Soil borings or any testing of existing soil conditions. Concrete, material, and soil testing.  Environmental, wetland, and flood plain, investigations and analysis  Review shop drawings.  Review and process Contractor’s payment requests. Receive, review, and forward to the Owner the Contractor’s record drawings, guarantees, and other close-out documentation.  Local zoning submittals and meetings.  Traffic or entrance studies.  Design or capacity calculations on downstream lift station. It is assumed that the lift station was designed appropriately to accept wastewater from this subdivision.  Landowner easement negotiations.  Geotechnical services.  Preparation of special assessment plat & schedule. Page 9 of 9 (Attachment A: Scope of Services) G:\13\13603\13603010\Contract\13603010 - PSA.docx

Sources

  • sharepoint (K-4 - Sanitary Sewer System Design Proposal - Hickory Knoll - MSA.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.