Text from the PDF text layer; check the PDF for anything that matters. ATTACHMENT A:
SCOPE OF SERVICES
PROPOSED SCOPE OF WORK
SANITARY SEWER EXTENSION TO HICKORY KNOLL SUBDIVISION
TIFFIN, IOWA
GENERAL PROJECT DESCRIPTION
It is our understanding that the City would like to extend sanitary sewer to the Hickory Knoll subdivision
south of Hwy 6 along the west side of S Park Road as shown in the attached exhibit indicating the intended
route. MSA Professional Services, Inc. shall provide the following services in accordance with the
completion of the above project: sanitary sewer will be run from S Park Road between Lots 1, 2, 9 & 8 to
Gable Way where it will be run both east and west to serve the subdivision. Easements will be required
along the private lots for sanitary sewer installation. It is MSA’s understanding that we will create
easement documentation for the City to use when acquiring these easements. Another potential route
for the sanitary sewer would be along the west side of S Park Rd south to Gable Way within the ROW,
however there is a large hill here that may be prohibitive for sanitary sewer installation. MSA proposes to
survey this alternate route to review feasibility for this alternate route. See attached Exhibit 1 – Project
Map for additional information.
TASK 1: PROJECT ADMINISTRATION
1. Project Administration
Manage and coordinate project team, budget, and schedules. Maintain communication
with Owner and stakeholders on project.
Provide monthly project updates, in writing to City Council on status of project through
the duration of design project.
2. Design Meetings
Project kick-off: Attend one meeting with City staff prior to starting work on the project.
Preliminary (50%) Plan review: Attend one meeting with City staff after preliminary plans
are complete, prior to starting final plans.
Final Plan review: Attend one meeting with City staff after plans have been updated based
on preliminary plan review, Owner feedback, and additional design development.
Unless otherwise noted, all meetings will take place at City Hall.
3. Quality Assurance/Quality Control
Employ documented quality-assurance/quality-control procedures throughout project.
4. Public Information Meeting
MSA will prepare for and attend up to one (1) public information meeting with impacted
property owners.
Public Information meeting shall be an informal open house style lasting no more than
two (2) hours at a location within the City of Tiffin. (Location to be determined by owner)
MSA will prepare project poster boards to display intended design intent.
Page 7 of 9
(Attachment A: Scope of Services)
G:\13\13603\13603010\Contract\13603010 - PSA.docx