other

WS - E - HIghway 6 Widening - Concept and Estimate

Dated September 19, 2023City Council — work session, September 19, 2023 3 pages

Open the PDF Searchable (OCR) PDF

Page 1 of 3

Text read by the vision model; check the PDF for anything that matters.
LEGEND CITY OF TIFFIN PAVEMENT LIMITS IOWA DOT PAVEMENT LIMITS PROPOSED PAVED SHOULDER WITH CURB AND GUTTER SI (TYP.) EXTENSION TO EXISTING STRUCTURE RECD APPROXIMATE EXISTING R/W (TYP.) BEGIN PROJECT STA 12+63.40 X=20,500,819.447 PROPOSED SIDEWALK APPROXIMATE EXISTING R/W (TYP.) PROPOSED STORM SEWER SEE D SHEETS FOR DETAILS PROPOSED PAVED SHOULDER WITH CURB AND GUTTER SI (TYP.) APPROXIMATE EXISTING R/W (TYP.) PROPOSED SIDEWALK PROPOSED STORM SEWER SEE D SHEETS FOR DETAILS APPROXIMATE EXISTING R/W (TYP.) PROPOSED PAVED SHOULDER

Sources

  • sharepoint (WS - E - HIghway 6 Widening - Concept and Estimate.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.