L-2 - Tiffin 2023 Year in Review - MSA

Open the PDF

Page 1 of 2

Text from the PDF text layer; check the PDF for anything that matters.
MSA’S PARTNERSHIP WITH THE CITY OF TIFFIN -2023- YEAR IN REVIEW HIGHWAY 6 PEDESTRIAN UNDERPASS INSPECTION COMPREHENSIVE MSA performed an inspection of the existing pedestrian box culvert WATER SYSTEM under Hwy 6 in April of 2023. EVALUATION MSA completed a water system evaluation of the City’s current water sources, treatment, storage, and distribution. MSA projected this information into the future and determined recommended improvements necessary to the City’s water system. The City conducted Reverse Osmosis pilot testing as a part of this evaluation. HIGHWAY 6 WIDENING TRAIL CONNECTION FROM MAIN STREET TO BETWEEN ROUNDABOUT PARK ROAD AND PARKING LOT Widening Hwy 6 from Main Street MSA designed and administered to Park Road roundabout. Project construction on a trail connection includes adding pedestrian from the Park Road/Hwy 6 accommodations and adding roundabout to the City Fields a two-way-left-turn lane down at the southeast corner of the the center of Hwy 6. Project is intersection. A majority of the anticipated to be constructed in construction is completed with 2027. the project being finalized in Spring of 2024. NORTH PARK ROAD IMPROVEMENTS Widening North Park Road from the existing 2-lane north of Hwy 6 to a 4-lane section with boulevard. Project includes upsizing water main, constructing a roundabout, and installing a pedestrian underpass. Project is anticipated to be constructed in 2025. REVERSE OSMOSIS WATER TREATMENT PLANT DESIGN STARTED One of the main improvements recommendations that came from the comprehensive water system evaluation was the need to improve the city’s water treatment. It was determined through a pilot study that Reverse Osmosis would be the most economical means of improving the City’s drinking water. Improvements are planned to begin construction in 2025. MSA 1

Sources

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.