other · K-4
K-4 - Hoist for Public Works
Page 2 of 2
Text read by the vision model; check the PDF for anything that matters.Neumiller Electric Inc.
Phone: 319-665-9036
Fax: 319-333-1370
FULL SERVICE ELECTRICAL CONTRACTOR
Name / Address
City of Tiffin
300 Railroad St.
PO Box 259
Tiffin, IA 52340
Project
Power for a New Hoist at the Shop Bldg
<table>
<tr>
<th>Description</th>
<th>Qty</th>
<th>Rate</th>
<th>Total</th>
</tr>
<tr>
<td>Power for a New Hoist at the Shop Building<br>-Provide and install a 208 volt 40 Amp 1 phase circuit to power the hoist. This includes providing and installing a new 40 Amp circuit breaker in the panel. Providing and installing new conduit and wire from the panel to the existing disconnect on the wall and from the disconnect to the hoist as discussed.<br>-Provide terminations of the power to the hoist.<br>-Provide a scissors lift to do the work.<br>-This does not include any other wiring or work that is not listed.</td>
<td>1</td>
<td>2,421.00</td>
<td>2,421.00</td>
</tr>
</table>
Total $2,421.00
Sources
- sharepoint (K-4 - Hoist for Public Works.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.