contract agreement · K-3
K-3 - Professional Services Agreement - Recreation Center - Atura Architecture
Page 1 of 9
Text read by the vision model; check the PDF for anything that matters.AIA Document B133® – 2019
Standard Form of Agreement Between Owner and Architect, Construction Manager as Constructor Edition
AGREEMENT made as of the Fifteenth day of October in the year Two Thousand Twenty-Four (2024)
(In words, indicate day, month and year.)
BETWEEN the Architect’s client identified as the Owner:
(Name, legal status, address, and other information)
City of Tiffin
300 Railroad Street
Tiffin, IA 52340
and the Architect:
(Name, legal status, address, and other information)
Atura Architecture
912 North 13th Street
Clear Lake, IA 50428
for the following Project:
(Name, location, and detailed description)
Tiffin Recreation Center
Tiffin, IA 52340
Project No.- 2023-111
The Construction Manager (if known):
(Name, legal status, address, and other information)
TBD
The Owner and Architect agree as follows.
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text.
This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification.
This document is intended to be used in conjunction with AIA Documents A201–2017™, General Conditions of the Contract for Construction; A133–2019™ Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price; and A134–2019™ Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee without a Guaranteed Maximum Price. AIA Document A201™–2017 is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
Sources
- sharepoint (K-3 - Professional Services Agreement - Recreation Center - Atura Architecture.pdf) — where it was found ↗ first seen Oct 12, 2026
Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.