K-3 - Change Order 4 - Boomerang - Well 5 Pump, Controls and Watermain

Open the PDF

Page 1 of 1

Text from the PDF text layer; check the PDF for anything that matters.
January 8, 2025 CHANGE ORDER NO. 4 WELL 5 PUMP, CONTROLS AND WATER MAIN TIFFIN, IOWA Change Order No. 4 adjusts the final project cost due to additional costs incurred by the City as a result of the issues with disinfection of the raw water line that ultimately led to replacement of the raw water line. The items will be deducted from the final cost and are as follows: 1. Additional cost for water sample delivery and testing. LS $ 2,755.00 2. Additional electrical cost to operate well to provide water to flush main and obtain samples prior to acceptance. LS $4,036.40 3. Additional cost to provide emergency repairs over standard rates for well 4 due to unavailability of Well 5. LS $ 5000.00 4. Additional cost for engineering services after original completion date and identification of issues. LS $12,798.16 Total: $24,589.56 Change Order No. 4 decreases the contract amount by $ 24,589.56 . BOOMERANG CORP. CITY OF TIFFIN, IOWA By Keegan Parizek By Title Project Manager Title Date 1/8/2025 Date VEENSTRA & KIMM, INC. ATTEST: By By Title Project Engineer Title Date January 8, 2025 Date V&K Job No. 5093/1

Sources

  • sharepoint (K-3 - Change Order 4 - Boomerang - Well 5 Pump, Controls and Watermain.pdf) — where it was found ↗ first seen Oct 12, 2026

This document's details as JSON

Data last updated October 15, 2026. Built from the archive's documents; see how the data is built.